What handover documentation for a liquid screed floor should include
An explanation of what a sensible handover pack for a liquid screed floor should contain, and why it's worth requesting even on smaller jobs.
Handover documentation is often overlooked on smaller domestic jobs, but having a written record of what was installed, and when, is useful well beyond the immediate flooring works. It costs little to compile at the time but can be genuinely difficult to reconstruct later once the pour is a distant memory.
It provides a reference point if questions arise later — during a future renovation, a flooring dispute, or simply when trying to remember what depth and product were used. Without any record, these details can only be guessed at, which is unhelpful if a problem needs investigating years down the line.
This page sets out what is reasonable to expect in a handover pack, and why requesting it, even on a modest domestic project, is a sensible habit rather than an unnecessary formality.

Why this matters beyond the immediate project
Years after a floor is covered, a record of the screed type and depth can be genuinely useful — for example when planning a future renovation, drilling into the floor, or investigating an unrelated issue. Without it, this information is easily lost.
A future owner or contractor working on the building has no way of knowing what lies beneath the floor covering unless a record has been kept, which can lead to unnecessary caution, exploratory work, or in the worst case accidental damage to pipework.
What's reasonable to request as a client
Asking for a simple written summary of what was installed, along with any test results, is a reasonable request on most jobs and shouldn't be seen as excessive, even where a formal contract doesn't specifically require it.
On larger or commercial projects, a more formal handover pack may already be part of the contract requirements, but the same basic principle applies equally well to a domestic extension or renovation.
Keeping records for future reference
A simple folder, whether physical or digital, containing the handover summary, test results and any photographs taken during the project is enough for most domestic purposes and doesn't need to be elaborate to be useful.
It is worth keeping this alongside other property records such as building control documentation or warranty paperwork, so it can be located easily if a future query arises.
Passing information on when a property changes hands
Where a property is sold or a building changes tenancy, passing on the handover documentation gives the new owner or occupier the same benefit of knowing what was installed, rather than starting from nothing.
This is particularly useful for underfloor heating installations, where knowing the exact pipe layout can prevent accidental damage during any future work involving drilling or fixing into the floor.
Handover documentation — the points that decide it
- A basic handover record typically includes the screed type, depth and area poured, and the date of the pour.
- Moisture test results, where testing was carried out, should be recorded and kept alongside the handover pack.
- Any specific curing or drying instructions given at the time are worth retaining for reference.
- Details of underfloor heating commissioning, where relevant, are often included as a related but separate record.
- Photographs of the poured floor before covering can be a useful reference for locating pipework or joints later.
- Product datasheets for the specific screed used provide a reference for any future maintenance or repair queries.
- Contact details for the installer are worth keeping in case a query arises well after the project has finished.
- Records of any known defects or agreed remedial work should be included so nothing is lost between handover and future ownership.
- Where a building changes hands, passing the handover pack to the new owner preserves the information for their benefit too.
Want a clear handover record for your project?
Ask us about the documentation we can provide for your completed screed floor.
Or call our landline on 01392 237700
Handover documentation — your questions
Keep going — closely linked topics
Process & decision guides
Preparing a screed for coverings
Process & decision guides
When other trades can return
Process & decision guides
Moisture testing methods compared
Process & decision guides
Checking a Quotation
Screed faults & diagnostics
Structural movement versus screed defects
Project types
Two-Storey Extension
In short
An explanation of what a sensible handover pack for a liquid screed floor should contain, and why it's worth requesting even on smaller jobs.
Want a clear handover record for your project?
Ask us about the documentation we can provide for your completed screed floor.