Cemfloor certified

Cement based liquid screed in Exeter

Flowing screed with cement chemistry top to bottom — the mix we default to wherever tiles, water or thin heated build-ups are involved. This is a pumped liquid screed, not traditional sand and cement (dry) screed, which we do not offer.

Why we pour Cemfloor

We're manufacturer-certified Cemfloor installers, trained by the maker, with every batch logged. The products we lay are Cemfloor CT-C30-F6 and Cemfloor Therm. Made in Ireland and pumped like any liquid screed, it keeps a cement binder throughout — so it gets on with tile adhesives, epoxy coatings and whatever wet trades follow.

We record the product, mix and installation details for each pour and provide clear aftercare guidance for the floor that follows.

Build-ups where it earns its place

  • Underfloor heating over suspended timber or PIR, where you want low cover and fast heat transfer.
  • Wet rooms, kitchens and basements — places a gypsum floor would be a liability.
  • Commercial slabs with SR1 written into the tiling spec.
  • Renovations where sand and cement simply won't dry inside the programme.
  • Large-format porcelain or LVT laid without an extra latex layer.

Thin over the pipes

Over wet heating we need just 30mm above the top of the pipe on a bonded build, or 35–40mm unbonded, against 65–75mm for traditional sand and cement. Less mass to warm means a more responsive floor. We confirm the exact figure on survey.

Drying, honestly

Allow roughly a millimetre a day for the first 40mm, slower beyond that. In normal conditions a 50mm floor is typically under 75% relative humidity inside three weeks. You can walk on it after 24–48 hours, and there's no compulsory laitance sand for most mixes — just the manufacturer-approved primer per the datasheet.

Choosing between the two

Tiles, water, or heating in the slab? Go cement. A purely dry residential floor under engineered wood where cost per m² leads? The anhydrite liquid screed may be the better fit. Deeper product detail sits on our Cemfloor screed page; prices and survey on screed floor installation in Exeter.

Pour-day numbers

Foot traffic
24–48 hours
Cover over UFH pipe
30mm bonded, 35–40mm unbonded
Thermal conductivity
≥ 2.0 W/mK
Flatness
SR1 (±2mm over 2m)
Laitance sanding
Not mandatory for most mixes
Hose run
150m+ routine
Free quote · No obligation

Price a Cemfloor pour

Name, phone and email — fixed price per m² back the same working day.

Call mobile

No obligation · Same-day reply

We lay liquid and flowing screeds only. We do not offer traditional sand and cement (dry) screed.

We cover Exeter and the surrounding Devon and Somerset areas.

Or call our landline on 01392 237700

Same-day reply
Fully insured
Written quote
07791 510849

Common questions

Is Cemfloor the same as anhydrite?
No. Cemfloor is cement-based; anhydrite screeds such as Gyvlon and Gypsol are calcium sulphate. That changes drying, adhesive compatibility and wet-area suitability.
How quickly does cement liquid screed dry?
Rule of thumb: 1mm a day for the first 40mm, slowing after that. A 50mm pour typically reaches under 75% RH inside three weeks in normal conditions.
Can it go in a wet room?
Yes. Cement chemistry doesn't degrade under repeated wetting the way gypsum-based screeds can.
Compare anhydrite liquid screed
Call LandlineGet a quoteWhatsApp