Installers & Contractors

Screed floor installation in Exeter

Pricing a screed job? This is how we install a floor — the steps, the real price bands, drying honesty and where we cover from our Exeter base.

Screeding contractors, not a middleman

Exeter Liquid Screeders are Cemfloor certified liquid screed installers. We pour cement-based Cemfloor and anhydrite systems on homes, extensions, commercial units and garages — the same crew from survey to finished floor.

Every installation is laser-levelled, pumped and finished to SR1 flatness, and backed by our 10-year guarantee.

Cemfloor Certified
Fully Insured
10-Year Guarantee
Free Site Survey
Free quote · No obligation

Price your screed installation

Name, phone and email — we'll come back with a fixed price per m² and the next pour date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

What an installation involves

01

Site survey

We visit, measure and assess your subfloor, insulation and underfloor heating layout.

02

Fixed-price quote

Screed depth, mix, prep and timing in one figure per m² — back to you within 24 hours.

03

Preparation

Perimeter edge foam, taped polythene membrane, UFH pressure-tested and clipped down, laser datum pins set to finish level.

04

Pump day

Mixer on the drive, hose fed through the property. Pumped, not barrowed — a typical 200 m² floor goes down in a single morning.

05

Dapple & finish

Crossed passes with the dappling bar to break surface tension and release air, leaving a level SR1 surface within 2mm.

06

Protect & dry

No traffic for 24–48 hours, then controlled drying. Anhydrite surfaces get the laitance sanded before tiling.

What it costs

Guide prices per m² for liquid screed installed in Devon. Small pours cost more per m² because mobilisation is the biggest fixed cost.

Under 50 m²£28–£36 / m²
50–150 m²£22–£28 / m²
150–500 m²£18–£24 / m²
500 m²+£15–£20 / m²

Full breakdown in our liquid screed cost guide.

Drying, honestly

Walk-on time is 24–48 hours for liquid screed, versus 3–7 days for traditional sand and cement. Walk-on is not the same as ready for finishes — full drying depends on depth and site conditions, and we plan it with you. Tight programme? See fast-drying screed.

Over underfloor heating

A standard UFH pour is 50–65mm, fully encapsulating the pipework for thermal performance. Edge insulation and pipe checks add typically £2–£4/m². More in our underfloor heating screed guide.

Exeter and Devon coverage

Within roughly 30 miles of Exeter — Exmouth, Sidmouth, Newton Abbot, Taunton — there's no travel surcharge. The Plymouth or Lyme Regis edge carries a small mobilisation fee, stated on the quote. See how our coverage works or all areas we cover.

Installation questions

How long before I can walk on a new screed floor?

Liquid screed is walk-on in 24–48 hours, against 3–7 days for traditional sand and cement. Full drying before floor finishes takes longer and depends on depth and conditions — we give you the plan for your floor on the quote.

How much does screed floor installation cost in Exeter?

As a guide: £28–£36/m² under 50 m², £22–£28/m² for 50–150 m², £18–£24/m² for 150–500 m², and £15–£20/m² above 500 m². Underfloor heating pours typically add £2–£4/m².

Do you install screed over underfloor heating?

Yes. A standard UFH pour is 50–65mm, encapsulating the pipework for good thermal performance, with edge insulation and pipe checks done before the pump starts.

Are you contractors or a lead service?

We are the installers. The Exeter-based, Cemfloor certified team that surveys and prices your floor is the team that pumps and finishes it.

Mobile Landline WhatsApp