Commercial Offices · South West

Commercial Office Floor Screed Across Devon, Somerset & Dorset

Liquid screed for commercial offices and business-park fit-outs.

Liquid screed work near Commercial Office Floor Screed Across Devon, Somerset & Dorset
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Commercial Office Floor Screed Across Devon, Somerset & Dorset

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Office pours in the South West usually happen as landlord Cat-A base-build or tenant Cat-B fit-out. We run both — RAMS lodged with the main contractor, moisture-tested handover, documented flatness for the raised-floor or LVT contractor.

For our regional coverage Cat-A pours we work to the landlord shell spec — usually 50–65mm Cemfloor over insulation and DPM on ground floor, or bonded from 40mm on upper-floor slabs. Documented flatness handover for the incoming tenant fit-out.

For Cat-B tenant fit-outs in core Devon & Somerset, we pour to the tenant's designer spec: bonded thin-section over the base-build slab, laser-levelled for raised access floor or direct-to-LVT installation.

Commercial Office Floor Screed at a glance

Sector

Commercial Office Floor Screed

Typical clients

commercial developers and Cat-A/Cat-B contractors

Core coverage

Devon, Somerset, Dorset

Base city

Exeter

System

Cemfloor cement-based & anhydrite

Flatness

SR1 to a 2m edge

Guarantee

Manufacturer product warranty plus our workmanship guarantee

Locations served

199+ towns and villages

Commercial Office Floor Screed — how we run it

For the South West Cat-A pours we work to the landlord shell spec — usually 50–65mm Cemfloor over insulation and DPM on ground floor, or bonded from 40mm on upper-floor slabs. Documented flatness handover for the incoming tenant fit-out.

For Cat-B tenant fit-outs in the South West, we pour to the tenant's designer spec: bonded thin-section over the base-build slab, laser-levelled for raised access floor or direct-to-LVT installation.

The flatness discipline is what raised floors need — no undulation over the grid, no shim-and-pack disputes on install day. We survey to SR1 and lodge it in the O&M pack.

Built for commercial developers and Cat-A/Cat-B contractors

Liquid screed for commercial offices and business-park fit-outs. We work directly with commercial developers and Cat-A/Cat-B contractors across Devon, Somerset and Dorset, with a single point of contact for the screed package.

Materials and systems for office screed

Cemfloor CT-C30-F6

Standard commercial-office grade with fast trade-back.

Bonded thin-section pour

40mm on upper-floor {town} office slabs where thresholds are fixed.

Documented flatness protocol

SR1 as standard, CSTR survey on request for {town} main contractors.

Perimeter isolation strip

Continuous around every wall, column and threshold.

Recent office screed work across the South West

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension
Estuary-side residential retrofit in Topsham
Estuary-side residential retrofit in Topsham

Why clients trust us on office screed

Cemfloor-certified, main-contractor-friendly
Landlord Cat-A base-build refurb experience across Devon, Somerset & Dorset
Local knowledge of the South West-area business-park access
Moisture-tested handover keyed to the raised-floor install date

Commercial Office Floor Screed — common questions

Can you handle Cat-A and Cat-B pours in the South West?+

Yes — both are regular parts of our commercial diary across the South West and the EX / TA / DT area.

Do you provide flatness records for raised access floors?+

Yes — SR1 to a 2m edge as standard, CSTR survey on request for the South West main contractors.

Can you work to a main-contractor programme?+

Yes — RAMS and CDM paperwork issued before the South West mobilisation, pre-start attendance standard.

What depth do you pour for commercial offices?+

Usually 50–65mm ground floor, bonded from 40mm on upper-floor the South West office slabs.

How long before raised floor or LVT install?+

For a 45mm bonded the South West office pour, typically 3–5 weeks to moisture-test target.

Do you attend pre-start meetings?+

Yes — pre-start attendance standard on every the South West commercial pour.

Commercial office pours in the South West run on programme, flatness and paperwork. We handle all three from pre-start to handover.

Commercial office screed quote — the South West

Send drawings and programme — fixed-price quote back against your the South West Cat-A or Cat-B schedule.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp