RH & moisture testing

Failed a Screed Moisture Test — What Happens Now

A relative humidity reading above the threshold for your chosen floor covering is a common, manageable outcome — it means the floor needs more time or more help drying, not that anything has gone wrong with the screed itself.

Free quote · No obligation

Get a moisture test done properly

Name, phone, email — we'll reply the same working day with a fixed price.

Call now
Same-day reply
Fully insured
5★ reviewed

Every floor covering has a moisture threshold it needs the substrate to be under before it can go down safely — typically 75% relative humidity for most adhesives and coverings, tighter again for some resin and wood finishes.

A test that comes back above that figure simply means the screed hasn't finished releasing moisture yet. It happens more often than people expect, usually because ambient conditions on site have been colder, damper or less ventilated than assumed.

This page explains how the test actually works, what a failed result really means, and the practical steps to get from a failed reading to a signed-off pass.

Self-build UFH pour near Tiverton
Self-build UFH pour near Tiverton

How we test screed moisture

  • Hygrometer boxes sealed to the surface for a minimum dwell time, reading relative humidity in the pocket of air beneath
  • Calcium carbide (Speedy) testing where a faster, destructive sample reading is needed
  • Multiple test points across the floor, not a single reading, since moisture can vary room to room
  • Testing at the depth relevant to the pour thickness and covering being installed

Typical RH thresholds by covering

Floor coveringMaximum RH before laying
Ceramic/porcelain tile (cement adhesive)Up to ~90–95% acceptable with the right adhesive
LVT / vinyl≤75% RH typical requirement
Engineered wood≤65–75% RH depending on manufacturer
Resin/epoxy coatings≤75% RH, often tighter

From a failed test to a pass

  1. 1

    Confirm the actual result

    We re-check the test method and dwell time before assuming the reading itself is right.

  2. 2

    Improve conditions

    Ventilation, heating and airflow adjustments to encourage natural drying.

  3. 3

    Dehumidify if the programme is tight

    Forced dehumidification can bring a stubborn reading down meaningfully faster.

  4. 4

    Retest and certify

    We retest and provide a written result once the floor is genuinely ready.

Free quote · No obligation

Get a moisture test done properly

Whether it's a first test or a retest after a failed reading, we'll test at the right points and give you a clear written result.

Call now
Same-day reply
Fully insured
5★ reviewed

Signing off a moisture test that hasn't genuinely passed just moves the failure downstream to the flooring trade — we'd rather hold the date and get the number right.

— Exeter Liquid Screeders

Failed Moisture Test — questions we get asked

Get a moisture test done properly

Whether it's a first test or a retest after a failed reading, we'll test at the right points and give you a clear written result.

Call now WhatsApp