Garage Floor Screed · Devon
Garage Floor Screed Poured to SR1 in Rewe
Whether you're future-proofing a Rewe garage for an EV charger or finishing a workshop floor, liquid screed gives you the flatness and density coatings need to bond.
Book your Rewe pour
Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.
Reserve a date07791 510849 WhatsApp usGet a fixed price for Garage Floor Screed Poured to SR1 in Rewe
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Whether you're future-proofing a Rewe garage for an EV charger or finishing a workshop floor, liquid screed gives you the flatness and density coatings need to bond.
For Rewe garage conversions becoming habitable rooms, we'll also coordinate UFH and insulation build-up so the finished floor sits at the right level for thresholds.
Most of our Rewe jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Rewe sits Exeter (5 mi), and we work the surrounding villages on the same week's diary.
Right fit for Rewe rural self-builders and farms
Rewe sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Rewe at a glance
County
Devon
District
East Devon
Postcode
EX5
Nearest city
Exeter (5 mi)
Nearest motorway
M5 (J28, ~7 mi)
Primary A-road
A396
Local industries
agriculture, equestrian yards
Common builds
stone farmhouses, barn conversions
Garage Floor Screed in Rewe — how it works
A typical Rewe single-garage floor of 18-24m² is poured and finished in well under a morning, with the pump set up on the driveway.
We assess the existing slab, prep with shot-blasting or grinding where needed, lay edge isolation and a DPM if unbonded, then pump and level the screed in a single visit.
How a Rewe pour runs
- 1
Site visit — assess the existing slab, falls, thresholds
- 2
Prep: clean, prime or lay DPM and insulation
- 3
Pump and level in a single morning
- 4
Cover for 24 hours, walk-on by day 2
- 5
Coatings or floor finishes once dry — typically 7-14 days
Floors poured around Rewe



Specifications suited to Rewe builds
Cemfloor CT-C30-F6
Cement-based screed — robust, coating-ready surface.
Bonding primer
For bonded pours over existing slabs.
DPM and slip membrane
For unbonded over insulation or older slabs.
Shot-blasting / grinding prep
Where the existing slab needs surface profile.
Within easy reach of Rewe
Common Rewe build questions
Do you tidy up afterwards?+
Wash-out is bagged and removed. We leave the Rewe site clean and the floor protected with sheeting.
Can liquid screed take an EV charger and a car's weight in Rewe?+
Yes — a properly specified 40-50mm liquid screed easily handles domestic vehicle loads. We'll size the build-up to your Rewe garage usage.
Can I finish the floor with epoxy?+
Absolutely — liquid screed gives you a flat, dense base that resin coatings bond to well once the screed is dry and the surface laitance is sanded off.
Will it slope to a drain?+
Liquid screed self-levels — it won't form a fall. If you need a drain fall in your Rewe garage, we form it in the substrate first, then screed at constant thickness.
What about cold garages — will it cure?+
We won't pour below 5°C. For winter jobs we'll either heat the space or schedule for a mild day in your Rewe diary.
Is it noisier than sand-and-cement?+
Pump day is loud for an hour or two while the truck and pump run on the driveway. After that, nothing.
Proof from the Devon workload
Book your Rewe pour
Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
