Commercial Screed · Devon
Commercial Screed Poured to SR1 in Rewe
From retail units at to office fit-outs across Rewe, our commercial screed work is priced as a fixed package against your programme, not a day-rate gamble.
Book your Rewe pour
Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.
Reserve a date07791 510849 WhatsApp usGet a fixed price for Commercial Screed Poured to SR1 in Rewe
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
From retail units at to office fit-outs across Rewe, our commercial screed work is priced as a fixed package against your programme, not a day-rate gamble.
On larger sites in Rewe we run our own moisture testing and hand the floor over with a written CM-test record so the flooring contractor can take it on without dispute.
Most of our Rewe jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Rewe sits Exeter (5 mi), and we work the surrounding villages on the same week's diary.
Who this is for in Rewe
Rewe sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Why Rewe site context matters
County
Devon
District
East Devon
Postcode
EX5
Nearest city
Exeter (5 mi)
Nearest motorway
M5 (J28, ~7 mi)
Primary A-road
A396
Local industries
agriculture, equestrian yards
Common builds
stone farmhouses, barn conversions
Commercial Screed in Rewe — how it works
Whether it's a single retail unit at or a 2,000m² distribution centre, the build-up is the same — DPM, insulation, screed, all to SR1.
We mobilise a static mixer and pump truck for larger Rewe commercial sites, pumping 30-50m³ per day with a small crew. The screed is laid, levelled and spike-rolled in continuous bays of any size.
What to expect on pour day in Rewe
- 1
Pre-start meeting with main contractor — programme, access, pump position, waste route
- 2
Substrate prep, DPM and insulation install (us or the main contractor)
- 3
Pour day: 30-50m³ pumped, levelled, spike-rolled per day
- 4
48-hour cure under protection
- 5
Moisture testing and handover record once dry
Floors poured around Rewe



Materials and systems we use in Rewe
Cemfloor CT-C30-F6
High-strength cement-based screed — preferred for commercial loading.
Cemfloor Therm
For commercial UFH installations.
Heavy-duty PIR insulation
100-150mm to hit commercial U-value targets.
Movement joints
Set at doorway thresholds and around columns to manage thermal expansion.
Nearby villages and towns
Common Rewe build questions
Can you work weekends or out-of-hours in Rewe?+
We do — retail fit-outs and live-environment jobs often need it. Weekend pours are quoted at a premium but we'll plan the programme with you.
Do you handle the insulation and DPM as well?+
We can — many Rewe main contractors prefer a single sub on the floor build-up. We'll price it either way.
What's your daily output on a commercial Rewe job?+
Typically 30-50m³ per pour day with a single team — that's roughly 600-900m² at 50mm depth. Bigger pours are coordinated with multiple deliveries.
Are you Cemfloor-certified for commercial work?+
Yes — fully certified installer, with manufacturer support on every Rewe commercial job and the 10-year guarantee on qualifying installs.
What about phased pours on live commercial sites?+
Common in Rewe retail work — we phase by zone, with day joints managed correctly so the finished floor still reads as one slab.
How do you handle large open-plan floors in Rewe?+
Liquid screed pours in continuous bays of any practical size. We just need a sensible pour sequence and movement joints at thresholds.
Proof from the Devon workload
Book your Rewe pour
Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
