New Build Screeding · Devon

New Build Screeding Poured to SR1 in Rewe

Developers building across Rewe need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.

Book your Rewe development into the diary

Multi-plot schemes need booking well ahead. Reserve your Rewe pour dates now and we'll confirm logistics with your site manager.

Reserve dates07791 510849 WhatsApp us
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for New Build Screeding Poured to SR1 in Rewe

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Developers building across Rewe need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.

Output on a typical Rewe plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.

Most of our Rewe jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Rewe sits Exeter (5 mi), and we work the surrounding villages on the same week's diary.

Right fit for Rewe rural self-builders and farms

Rewe sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.

Why Rewe site context matters

County

Devon

District

East Devon

Postcode

EX5

Nearest city

Exeter (5 mi)

Nearest motorway

M5 (J28, ~7 mi)

Primary A-road

A396

Local industries

agriculture, equestrian yards

Common builds

stone farmhouses, barn conversions

New Build Screeding in Rewe — how it works

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Rewe development moves through screed without a gap in the build sequence.

Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Rewe site rather than a new quote for every unit.

How a Rewe pour runs

  1. 1

    Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates

  2. 2

    Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot

  3. 3

    Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn

  4. 4

    Protect each plot for 24-48 hours while the crew moves on to the next

  5. 5

    Moisture testing and a written handover record issued per plot

  6. 6

    Snagging and any remedial work coordinated directly with the site manager before final trades move in

Latest jobs across Devon

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension
Large open-plan pour for a new-build near Cullompton
Large open-plan pour for a new-build near Cullompton

Specifications suited to Rewe builds

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

Rewe screed questions, answered

Do you offer a guarantee on new build plots?+

Yes, as a Cemfloor-certified installer, qualifying plots are backed by the manufacturer's 10-year guarantee, issued per unit as part of the handover pack.

Do you provide RAMS for a new build site in Rewe?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

How many plots can you screed per day on a Rewe development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

Do you price the whole Rewe site or plot by plot?+

Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Rewe site come out to the same depth and finish.

What backs our Rewe work

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Rewe-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Book your Rewe development into the diary

Multi-plot schemes need booking well ahead. Reserve your Rewe pour dates now and we'll confirm logistics with your site manager.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp