New Build Screeding · Devon
Broadclyst New Build Screeding Specialists
On multi-plot developments in Broadclyst we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
Multi-plot pours across EX5
From a handful of units to a full Broadclyst phase, we plan crew and pump around your build programme, not ours.
Request a quote07791 510849 WhatsApp usGet a fixed price for Broadclyst New Build Screeding Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Broadclyst we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Broadclyst scheme, so plot 1 and plot 40 come out identical.
Most of our Broadclyst jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Broadclyst sits Exeter (5 mi), and we work the surrounding villages on the same week's diary.
Who this is for in Broadclyst
Broadclyst sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Why Broadclyst site context matters
County
Devon
District
East Devon
Postcode
EX5
Nearest city
Exeter (5 mi)
Nearest motorway
M5 (J29, ~4 mi)
Primary A-road
B3181 / A30
Local industries
National Trust estate, agriculture
Common builds
National Trust cob cottages, Killerton-estate barns
New Build Screeding in Broadclyst — how it works
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Broadclyst development moves through screed without a gap in the build sequence.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Broadclyst site rather than a new quote for every unit.
What to expect on pour day in Broadclyst
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Latest jobs across Devon



Materials and systems we use in Broadclyst
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Nearby villages and towns
Broadclyst screed questions, answered
Do you handle underfloor heating across a whole Broadclyst development?+
Yes, where UFH is part of the development spec we coordinate pressure-testing and pour sequencing with the M&E contractor plot by plot.
Do you provide RAMS for a new build site in Broadclyst?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How many plots can you screed per day on a Broadclyst development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Can you scale up if the Broadclyst programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Do you price the whole Broadclyst site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
What backs our Broadclyst work
Hundreds of square metres poured around Broadclyst in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Multi-plot pours across EX5
From a handful of units to a full Broadclyst phase, we plan crew and pump around your build programme, not ours.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700