New Build Screeding · Devon
New Build Screeding in Whipton
On multi-plot developments in Whipton we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

Get a fixed price for New Build Screeding in Whipton
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Whipton we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Whipton scheme, so plot 1 and plot 40 come out identical.
Most of our Whipton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Whipton sits Exeter (2 mi), and we work the surrounding villages on the same week's diary.
Why Whipton site context matters
County
Devon
District
Exeter
Postcode
EX1
Nearest city
Exeter (2 mi)
Nearest motorway
M5 (J29, ~3 mi)
Primary A-road
B3181
Local industries
residential, care homes
Common builds
post-war semis, HMO conversions
New Build Screeding in Whipton — how it works
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Whipton development moves through screed without a gap in the build sequence.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Whipton site rather than a new quote for every unit.
Right fit for Whipton homeowners and self-builders
Whipton is residential-heavy, with renovation, extension and self-build briefs dominating the diary. We work directly with homeowners and their builders, with a single point of contact for the screed package.
Specifications suited to Whipton builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Latest jobs across Devon



What backs our Whipton work
Hundreds of square metres poured around Whipton in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Whipton screed questions, answered
Do you offer a guarantee on new build plots?+
Yes, as a Cemfloor-certified installer, qualifying plots are backed by the manufacturer's 10-year guarantee, issued per unit as part of the handover pack.
How many plots can you screed per day on a Whipton development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Whipton?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Whipton site come out to the same depth and finish.
Can you scale up if the Whipton programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Nearby villages and towns
From the pre-start meeting to the last plot's moisture sign-off, our Whipton new build jobs run as one coordinated package, priced against the whole site, not negotiated unit by unit.
Multi-plot pours across EX1
From a handful of units to a full Whipton phase, we plan crew and pump around your build programme, not ours.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
