Liquid screed pour near Cemfloor-Certified New Build Screeding Across Heavitree

New Build Screeding · Devon

Cemfloor-Certified New Build Screeding Across Heavitree

Heavitree new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Cemfloor-Certified New Build Screeding Across Heavitree

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Heavitree new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Heavitree development moves through screed without a gap in the build sequence.

Most of our Heavitree jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Heavitree sits Exeter (1 mi), and we work the surrounding villages on the same week's diary.

Local facts that shape every Heavitree pour

County

Devon

District

Exeter

Postcode

EX1

Nearest city

Exeter (1 mi)

Nearest motorway

M5 (J30, ~3 mi)

Primary A-road

B3183

Local industries

RD&E hospital, student lets

Common builds

Victorian terraces, hospital-adjacent flats

Common briefs across Heavitree

  • Victorian terraces — a regular brief in Heavitree
  • Hospital-adjacent flats — a regular brief in Heavitree
  • Conversion HMOs — a regular brief in Heavitree
  • RD&E hospital — a regular brief in Heavitree
  • Student lets — a regular brief in Heavitree

New Build Screeding in Heavitree — how it works

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Heavitree development moves through screed without a gap in the build sequence.

Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Heavitree site rather than a new quote for every unit.

Cemfloor systems for Heavitree

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

Latest jobs across Devon

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension
Estuary-side residential retrofit in Topsham
Estuary-side residential retrofit in Topsham

What backs our Heavitree work

  1. 01Cemfloor-certified, fully insured, CDM-aware
  2. 02Coordinated with most South West UFH installers
  3. 03Pre-start meeting standard on every commercial job
  4. 04Local knowledge — we know the M5 (J30, ~3 mi) access window and B3183 traffic patterns

Heavitree screed questions, answered

How quickly can follow-on trades get back onto a plot?+

Liquid screed allows light foot traffic from 24-48 hours per plot, which is why most Heavitree developers specify it over traditional screed on programme-driven builds.

How many plots can you screed per day on a Heavitree development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

Do you provide RAMS for a new build site in Heavitree?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Do you price the whole Heavitree site or plot by plot?+

Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.

Can you scale up if the Heavitree programme accelerates?+

Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.

From the pre-start meeting to the last plot's moisture sign-off, our Heavitree new build jobs run as one coordinated package, priced against the whole site, not negotiated unit by unit.

Cemfloor-certified plot screeding near Heavitree

Manufacturer-backed installs, per-plot moisture records and a ten-year guarantee on qualifying units.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp