On multi-plot developments in Sowton we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Sowton New Build Screeding Specialists

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

On multi-plot developments in Sowton we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Sowton scheme, so plot 1 and plot 40 come out identical.

Most of our Sowton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Sowton sits Exeter (3 mi), and we work the surrounding villages on the same week's diary.

Sowton projects we see most

  • Office parks — a regular brief in Sowton
  • Distribution warehouses — a regular brief in Sowton
  • Hotel buildings — a regular brief in Sowton
  • Met Office support — a regular brief in Sowton
  • Distribution — a regular brief in Sowton

Who this is for in Sowton

Sowton skews commercial — trade parks like Exeter Business Park, contractor-led fit-outs, and developer estates. We price as a sub-contractor on programme, with RAMS and CDM documentation issued ahead of mobilisation.

New Build Screeding in Sowton — how it works

Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Sowton site rather than a new quote for every unit.

Output on a typical Sowton plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.

Materials and systems we use in Sowton

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

What to expect on pour day in Sowton

  1. 1

    Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates

  2. 2

    Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot

  3. 3

    Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn

  4. 4

    Protect each plot for 24-48 hours while the crew moves on to the next

  5. 5

    Moisture testing and a written handover record issued per plot

  6. 6

    Snagging and any remedial work coordinated directly with the site manager before final trades move in

Recent work near Sowton

Estuary-side residential retrofit in Topsham
Estuary-side residential retrofit in Topsham
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension

Trust points for a Sowton brief

Hundreds of square metres poured around Sowton in the last 12 months

Single-team continuity — same crew, same standards, every job

Written fixed-price quotes — no day-rate creep

Moisture-test handover record so flooring contractors take the slab on without dispute

FAQs from Sowton clients

Do you provide RAMS for a new build site in Sowton?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

How many plots can you screed per day on a Sowton development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Can you scale up if the Sowton programme accelerates?+

Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Sowton site come out to the same depth and finish.

Do you price the whole Sowton site or plot by plot?+

Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.

Screeding a new build site in Sowton?

Send us the plot count, floor areas and target handover dates, and we'll come back with a development-wide fixed price.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp