Countess Wear new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.
Get a fixed price for New Build Screeding — Countess Wear, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Countess Wear new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Countess Wear development moves through screed without a gap in the build sequence.
Most of our Countess Wear jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Countess Wear sits Exeter (3 mi), and we work the surrounding villages on the same week's diary.
Where liquid screed earns its keep in Countess Wear
- Riverside semis — a regular brief in Countess Wear
- Sowton-edge offices — a regular brief in Countess Wear
- New flats — a regular brief in Countess Wear
- Sowton offices — a regular brief in Countess Wear
- Met Office support — a regular brief in Countess Wear
Built for Countess Wear homeowners and contractors alike
Countess Wear runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.
New Build Screeding in Countess Wear — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Countess Wear scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Countess Wear development moves through screed without a gap in the build sequence.
Cemfloor systems for Countess Wear
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Step-by-step for a Countess Wear job
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Floors poured around Countess Wear



Adjacent areas — usually same-week diary
Proof from the Devon workload
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J30, ~2 mi) access window and A379 traffic patterns
Common Countess Wear build questions
What happens if a plot isn't ready when our crew arrives?+
We build flexibility into the plot sequence and communicate daily with the site manager, moving to the next ready plot rather than losing the day.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Countess Wear?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How many plots can you screed per day on a Countess Wear development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Can you scale up if the Countess Wear programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Countess Wear site come out to the same depth and finish.
Book your Countess Wear development into the diary
Multi-plot schemes need booking well ahead. Reserve your Countess Wear pour dates now and we'll confirm logistics with your site manager.