Liquid screed pour near New Build Screeding in Exminster

New Build Screeding · Devon

New Build Screeding in Exminster

On multi-plot developments in Exminster we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for New Build Screeding in Exminster

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

On multi-plot developments in Exminster we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Exminster scheme, so plot 1 and plot 40 come out identical.

Most of our Exminster jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Exminster sits Exeter (4 mi), and we work the surrounding villages on the same week's diary.

Why Exminster site context matters

County

Devon

District

Teignbridge

Postcode

EX6

Nearest city

Exeter (4 mi)

Nearest motorway

M5 (J31, ~2 mi)

Primary A-road

A379

Local industries

Matford trade park, residential developer flow

Common builds

Matford-side new builds, former asylum conversions

Exminster projects we see most

  • Matford-side new builds — a regular brief in Exminster
  • Former asylum conversions — a regular brief in Exminster
  • Riverside flats — a regular brief in Exminster
  • Matford trade park — a regular brief in Exminster
  • Residential developer flow — a regular brief in Exminster

New Build Screeding in Exminster — how it works

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Exminster development moves through screed without a gap in the build sequence.

Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Exminster site rather than a new quote for every unit.

Materials and systems we use in Exminster

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

Latest jobs across Devon

Estuary-side residential retrofit in Topsham
Estuary-side residential retrofit in Topsham
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension

What backs our Exminster work

Hundreds of square metres poured around Exminster in the last 12 months

Single-team continuity — same crew, same standards, every job

Written fixed-price quotes — no day-rate creep

Moisture-test handover record so flooring contractors take the slab on without dispute

Exminster screed questions, answered

Do you handle underfloor heating across a whole Exminster development?+

Yes, where UFH is part of the development spec we coordinate pressure-testing and pour sequencing with the M&E contractor plot by plot.

How many plots can you screed per day on a Exminster development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

Do you provide RAMS for a new build site in Exminster?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Exminster site come out to the same depth and finish.

Can you scale up if the Exminster programme accelerates?+

Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.

From the pre-start meeting to the last plot's moisture sign-off, our Exminster new build jobs run as one coordinated package, priced against the whole site, not negotiated unit by unit.

Screeding a new build site in Exminster?

Send us the plot count, floor areas and target handover dates, and we'll come back with a development-wide fixed price.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp