New Build Screeding — Kennford, Devon
Kennford new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.
Keep your Kennford plots on programme
Screed is often the trade holding up the schedule. Let's agree pump access and plot sequencing before it becomes a bottleneck.
Talk to us07791 510849 WhatsApp usGet a fixed price for New Build Screeding — Kennford, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Kennford new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Kennford development moves through screed without a gap in the build sequence.
Most of our Kennford jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Kennford sits Exeter (5 mi), and we work the surrounding villages on the same week's diary.
Built for Kennford homeowners and self-builders
Kennford is residential-heavy, with renovation, extension and self-build briefs dominating the diary. We work directly with homeowners and their builders, with a single point of contact for the screed package.
What we plan around in Kennford
County
Devon
District
Teignbridge
Postcode
EX6
Nearest city
Exeter (5 mi)
Nearest motorway
M5 (J31, ~2 mi)
Primary A-road
A38
Local industries
local retail, school and community builds
Common builds
1930s semis, estate new-builds
New Build Screeding in Kennford — how it works
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Kennford development moves through screed without a gap in the build sequence.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Kennford site rather than a new quote for every unit.
Step-by-step for a Kennford job
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Latest jobs across Devon



Cemfloor systems for Kennford
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Adjacent areas — usually same-week diary
Kennford screed questions, answered
How quickly can follow-on trades get back onto a plot?+
Liquid screed allows light foot traffic from 24-48 hours per plot, which is why most Kennford developers specify it over traditional screed on programme-driven builds.
How many plots can you screed per day on a Kennford development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Kennford?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Kennford site come out to the same depth and finish.
Can you scale up if the Kennford programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
What backs our Kennford work
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J31, ~2 mi) access window and A38 traffic patterns
Keep your Kennford plots on programme
Screed is often the trade holding up the schedule. Let's agree pump access and plot sequencing before it becomes a bottleneck.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site