New Build Screeding · Devon
New Build Screeding — Ide, Devon
Developers building across Ide need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.

Get a fixed price for New Build Screeding — Ide, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Developers building across Ide need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Output on a typical Ide plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Most of our Ide jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Ide sits Exeter (2 mi), and we work the surrounding villages on the same week's diary.
Why Ide site context matters
County
Devon
District
Exeter
Postcode
EX2
Nearest city
Exeter (2 mi)
Nearest motorway
M5 (J31, ~3 mi)
Primary A-road
A30
Local industries
conservation residential, hospitality
Common builds
listed cob cottages, conservation infills
New Build Screeding in Ide — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Ide scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Ide development moves through screed without a gap in the build sequence.
Who this is for in Ide
Ide is residential-heavy, with renovation, extension and self-build briefs dominating the diary. We work directly with homeowners and their builders, with a single point of contact for the screed package.
Materials and systems we use in Ide
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Floors poured around Ide



Proof from the Devon workload
Common Ide build questions
Are you set up for NHBC or LABC warranty requirements?+
Yes, our build-ups and documentation are prepared to match whichever warranty provider your Ide development is registered with.
How many plots can you screed per day on a Ide development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Ide?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
Can you scale up if the Ide programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Ide site come out to the same depth and finish.
Nearby villages and towns
Whether it's a handful of units or a full homeowners and self-builders phase in Ide, the aim is consistent, plot after plot flat, dried on schedule, handed over with its own written record.
Book your Ide development into the diary
Multi-plot schemes need booking well ahead. Reserve your Ide pour dates now and we'll confirm logistics with your site manager.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
