Underfloor Heating Screed · Devon

Underfloor Heating Screed — Ide, Devon

When Ide self-builders specify UFH, the screed is what makes the system efficient. We pump Cemfloor Therm directly around your pressure-tested pipework for full encapsulation.

Liquid screed work near Underfloor Heating Screed — Ide, Devon
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Underfloor Heating Screed — Ide, Devon

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

When Ide self-builders specify UFH, the screed is what makes the system efficient. We pump Cemfloor Therm directly around your pressure-tested pipework for full encapsulation.

For Ide UFH builds the typical sequence is: insulation board down, pipes clipped and pressure-tested, edge insulation in place, then we pump and level in a single visit.

Most of our Ide jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Ide sits Exeter (2 mi), and we work the surrounding villages on the same week's diary.

EX2 access, routes and logistics

County

Devon

District

Exeter

Postcode

EX2

Nearest city

Exeter (2 mi)

Nearest motorway

M5 (J31, ~3 mi)

Primary A-road

A30

Local industries

conservation residential, hospitality

Common builds

listed cob cottages, conservation infills

Underfloor Heating Screed in Ide — how it works

The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.

For Ide UFH builds the typical sequence is: insulation board down, pipes clipped and pressure-tested, edge insulation in place, then we pump and level in a single visit.

Built for Ide homeowners and self-builders

Ide is residential-heavy, with renovation, extension and self-build briefs dominating the diary. We work directly with homeowners and their builders, with a single point of contact for the screed package.

Cemfloor systems for Ide

Cemfloor Therm

Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.

PIR/Phenolic insulation board

70-150mm typical depending on build regs U-value target.

Edge insulation strip

Critical around UFH zones to allow thermal expansion.

Pressure-testing kit

Pipes held at 6 bar through the pour to flag any damage immediately.

Recent work near Ide

UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth
Self-build UFH pour near Tiverton
Self-build UFH pour near Tiverton
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter

Trust points for a Ide brief

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Ide-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

FAQs from Ide clients

When can I switch the underfloor heating on in Ide?+

On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Ide clients to the schedule.

Will the screed crack as the UFH heats up?+

Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.

Does liquid UFH screed improve EPC ratings?+

Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.

What depth of screed over UFH pipes do you recommend?+

Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.

What if a pipe leaks during the pour?+

Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.

How does this affect my floor coverings in Ide?+

Once commissioned and the floor moisture content is signed off (CM test, typically below 0.5% for tile), most coverings go down as normal. We hand you a commissioning record.

If you're planning Underfloor Heating Screed in Ide, the brief almost always comes down to flatness, dry-time and access — get those right and the trades behind you stay on programme.

Book your Ide pour

Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp