Underfloor Heating Screed · Devon
Underfloor Heating Screed — Kennford, Devon
Liquid UFH screed in Kennford replaces the air gaps and voids that bog standard sand-and-cement leaves around pipes, lifting system response and cutting running costs.
Need Underfloor Heating Screed priced for Kennford?
Tell us the square metres and access notes. Most Kennford quotes go out the same day.
Request your quote07791 510849 WhatsApp usGet a fixed price for Underfloor Heating Screed — Kennford, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Liquid UFH screed in Kennford replaces the air gaps and voids that bog standard sand-and-cement leaves around pipes, lifting system response and cutting running costs.
We pour Cemfloor Therm liquid screed over your UFH pipes at 50mm above pipe (typically 65-75mm total over insulation), giving full pipe encapsulation, fast thermal response and a finished surface flat to SR1.
Most of our Kennford jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Kennford sits Exeter (5 mi), and we work the surrounding villages on the same week's diary.
Who this is for in Kennford
Kennford is residential-heavy, with renovation, extension and self-build briefs dominating the diary. We work directly with homeowners and their builders, with a single point of contact for the screed package.
Local facts that shape every Kennford pour
County
Devon
District
Teignbridge
Postcode
EX6
Nearest city
Exeter (5 mi)
Nearest motorway
M5 (J31, ~2 mi)
Primary A-road
A38
Local industries
local retail, school and community builds
Common builds
1930s semis, estate new-builds
Underfloor Heating Screed in Kennford — how it works
We pour Cemfloor Therm liquid screed over your UFH pipes at 50mm above pipe (typically 65-75mm total over insulation), giving full pipe encapsulation, fast thermal response and a finished surface flat to SR1.
The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.
What to expect on pour day in Kennford
- 1
UFH installer fits manifold, pipes and pressure-tests to 6 bar
- 2
We confirm edge insulation, DPM and pipe coverage depth
- 3
Pump and level the screed with pipes still under pressure
- 4
Slow commissioning of the heating — usually after 7 days, ramping per manufacturer spec
- 5
Floor coverings once moisture is signed off and commissioning is complete
Latest jobs across Devon



Materials and systems we use in Kennford
Cemfloor Therm
Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.
PIR/Phenolic insulation board
70-150mm typical depending on build regs U-value target.
Edge insulation strip
Critical around UFH zones to allow thermal expansion.
Pressure-testing kit
Pipes held at 6 bar through the pour to flag any damage immediately.
Other areas we cover near Kennford
Kennford screed questions, answered
Do you fit the UFH pipes yourself?+
We work alongside your chosen UFH installer rather than fitting pipes ourselves — most Kennford jobs come with a heating sub-contractor already lined up, and we coordinate dates with them.
Does liquid UFH screed improve EPC ratings?+
Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.
What depth of screed over UFH pipes do you recommend?+
Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.
What if a pipe leaks during the pour?+
Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.
When can I switch the underfloor heating on in Kennford?+
On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Kennford clients to the schedule.
Will the screed crack as the UFH heats up?+
Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.
What backs our Kennford work
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J31, ~2 mi) access window and A38 traffic patterns
Need Underfloor Heating Screed priced for Kennford?
Tell us the square metres and access notes. Most Kennford quotes go out the same day.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
