New Build Screeding · Devon
Cemfloor-Certified New Build Screeding Across Clyst St Mary
Clyst St Mary new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.
Get a fixed price for Cemfloor-Certified New Build Screeding Across Clyst St Mary
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Clyst St Mary new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Clyst St Mary development moves through screed without a gap in the build sequence.
Most of our Clyst St Mary jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Clyst St Mary sits Exeter (4 mi), and we work the surrounding villages on the same week's diary.
New Build Screeding in Clyst St Mary — how it works
Output on a typical Clyst St Mary plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Clyst St Mary scheme, so plot 1 and plot 40 come out identical.
EX5 access, routes and logistics
County
Devon
District
East Devon
Postcode
EX5
Nearest city
Exeter (4 mi)
Nearest motorway
M5 (J30, ~1 mi)
Primary A-road
A3052 / A376
Local industries
Winslade Park offices, retail park trade
Common builds
ribbon-developed semis, new estates at Winslade Park
What Clyst St Mary builds usually need
- Ribbon-developed semis — a regular brief in Clyst St Mary
- New estates at Winslade Park — a regular brief in Clyst St Mary
- Retail-park units — a regular brief in Clyst St Mary
- Winslade Park offices — a regular brief in Clyst St Mary
- Retail park trade — a regular brief in Clyst St Mary
Clyst St Mary-area projects



What to expect on pour day in Clyst St Mary
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Why Clyst St Mary clients pick us
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J30, ~1 mi) access window and A3052 / A376 traffic patterns
Clyst St Mary-area service radius
Materials and systems we use in Clyst St Mary
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
What people in Clyst St Mary usually ask
Do you price the whole Clyst St Mary site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Do you provide RAMS for a new build site in Clyst St Mary?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
How many plots can you screed per day on a Clyst St Mary development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Can you scale up if the Clyst St Mary programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Clyst St Mary site come out to the same depth and finish.
Book your Clyst St Mary development into the diary
Multi-plot schemes need booking well ahead. Reserve your Clyst St Mary pour dates now and we'll confirm logistics with your site manager.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700