Liquid Screed · Devon

Cemfloor-Certified Liquid Screed Across Clyst St Mary

From Winslade Park commercial floors to Sowton Village self-builds, liquid screed gives you one continuous slab with no shrinkage cracks and minimal curling.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Cemfloor-Certified Liquid Screed Across Clyst St Mary

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

From Winslade Park commercial floors to Sowton Village self-builds, liquid screed gives you one continuous slab with no shrinkage cracks and minimal curling.

We pump Cemfloor calcium-sulphate screed from a static mixer into your building, level it with a dappling bar, and walk away with a floor that's typically dry enough for floor coverings in roughly one day per millimetre of depth.

Most of our Clyst St Mary jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Clyst St Mary sits Exeter (4 mi), and we work the surrounding villages on the same week's diary.

Liquid Screed in Clyst St Mary — how it works

Unlike a traditional sand-and-cement screed, you'll be back on the floor in 24-48 hours rather than a week, and the surface is flat enough to lay LVT or large-format tile without further latex.

We pump Cemfloor calcium-sulphate screed from a static mixer into your building, level it with a dappling bar, and walk away with a floor that's typically dry enough for floor coverings in roughly one day per millimetre of depth.

Local facts that shape every Clyst St Mary pour

County

Devon

District

East Devon

Postcode

EX5

Nearest city

Exeter (4 mi)

Nearest motorway

M5 (J30, ~1 mi)

Primary A-road

A3052 / A376

Local industries

Winslade Park offices, retail park trade

Common builds

ribbon-developed semis, new estates at Winslade Park

Common briefs across Clyst St Mary

  • Ribbon-developed semis — a regular brief in Clyst St Mary
  • New estates at Winslade Park — a regular brief in Clyst St Mary
  • Retail-park units — a regular brief in Clyst St Mary
  • Winslade Park offices — a regular brief in Clyst St Mary
  • Retail park trade — a regular brief in Clyst St Mary

Floors poured around Clyst St Mary

Estuary-side residential retrofit in Topsham
Estuary-side residential retrofit in Topsham
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension

Step-by-step for a Clyst St Mary job

  1. 1

    Site visit and written quote — confirm depths, area, access, build-up

  2. 2

    We prep edge insulation, polythene DPM and any UFH coordination

  3. 3

    Pump day: ready-mixed screed pumped, levelled and spike-rolled in one pour

  4. 4

    Cover and protect for 24-48 hours

  5. 5

    Light foot traffic from day 2; floor coverings once moisture content is signed off

Proof from the Devon workload

  1. 01Cemfloor-certified, fully insured, CDM-aware
  2. 02Coordinated with most South West UFH installers
  3. 03Pre-start meeting standard on every commercial job
  4. 04Local knowledge — we know the M5 (J30, ~1 mi) access window and A3052 / A376 traffic patterns

Cemfloor systems for Clyst St Mary

Cemfloor CT-C30-F6

Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.

Cemfloor Therm

Optimised for underfloor heating with high thermal conductivity.

Acoustic and thermal insulation underlay

PIR, EPS or acoustic mat depending on the build-up.

Edge isolation strip

10mm closed-cell foam to allow thermal movement.

Common Clyst St Mary build questions

Do you sand the floor afterwards?+

On calcium-sulphate screeds we sand off the surface laitance roughly 5-7 days after the pour, before any floor coverings go down.

Can liquid screed go over an existing concrete slab?+

Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the Clyst St Mary site visit.

How quickly can I walk on a liquid screed floor in Clyst St Mary?+

Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific Clyst St Mary job.

Can you pour in cold weather?+

Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any Clyst St Mary pour in the colder months.

Do I need to be on site for the pour in Clyst St Mary?+

Not necessarily — we usually agree access with the main contractor or self-builder and run the pour with our own team. We'll confirm the Clyst St Mary access route, pump position and waste route before the day.

Do you offer a guarantee?+

Yes — as a Cemfloor-certified installer, qualifying jobs are backed by a 10-year manufacturer-supported guarantee.

Book your Clyst St Mary pour

Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp