Liquid Screed · Devon

Liquid Screed Poured to SR1 in Pinhoe

Across Pinhoe we lay self-levelling Cemfloor screed at depths from 30mm, pumping straight off the truck and finishing to a true SR1 — no hand-trowelling, no cold joints.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Liquid Screed Poured to SR1 in Pinhoe

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Across Pinhoe we lay self-levelling Cemfloor screed at depths from 30mm, pumping straight off the truck and finishing to a true SR1 — no hand-trowelling, no cold joints.

Liquid screed bonds into a single monolithic layer with no bays, no day joints and no need for steel mesh — it's poured around any UFH pipework you've already pressure-tested.

Most of our Pinhoe jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Pinhoe sits Exeter (3 mi), and we work the surrounding villages on the same week's diary.

Liquid Screed in Pinhoe — how it works

The screed arrives ready-mixed on a truck, gets pumped through a hose to wherever it's needed in the building, and self-levels to within a couple of millimetres across the room. We spike-roll it to release air, then leave it.

Liquid screed bonds into a single monolithic layer with no bays, no day joints and no need for steel mesh — it's poured around any UFH pipework you've already pressure-tested.

What we plan around in Pinhoe

County

Devon

District

Exeter

Postcode

EX1

Nearest city

Exeter (3 mi)

Nearest motorway

M5 (J29, ~2 mi)

Primary A-road

A30 / B3181

Local industries

Pinhoe Quarry, new-build housing

Common builds

large new-build estates, station-side flats

Where liquid screed earns its keep in Pinhoe

  • Large new-build estates — a regular brief in Pinhoe
  • Station-side flats — a regular brief in Pinhoe
  • Small commercial units — a regular brief in Pinhoe
  • Pinhoe Quarry — a regular brief in Pinhoe
  • New-build housing — a regular brief in Pinhoe

Recent work near Pinhoe

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension
Estuary-side residential retrofit in Topsham
Estuary-side residential retrofit in Topsham

How a Pinhoe pour runs

  1. 1

    Site visit and written quote — confirm depths, area, access, build-up

  2. 2

    We prep edge insulation, polythene DPM and any UFH coordination

  3. 3

    Pump day: ready-mixed screed pumped, levelled and spike-rolled in one pour

  4. 4

    Cover and protect for 24-48 hours

  5. 5

    Light foot traffic from day 2; floor coverings once moisture content is signed off

Trust points for a Pinhoe brief

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Pinhoe-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Specifications suited to Pinhoe builds

Cemfloor CT-C30-F6

Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.

Cemfloor Therm

Optimised for underfloor heating with high thermal conductivity.

Acoustic and thermal insulation underlay

PIR, EPS or acoustic mat depending on the build-up.

Edge isolation strip

10mm closed-cell foam to allow thermal movement.

FAQs from Pinhoe clients

Can liquid screed go over an existing concrete slab?+

Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the Pinhoe site visit.

Can you pour in cold weather?+

Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any Pinhoe pour in the colder months.

How quickly can I walk on a liquid screed floor in Pinhoe?+

Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific Pinhoe job.

Does liquid screed crack like sand-and-cement?+

Calcium-sulphate and modern cement-based liquid screeds have very low drying shrinkage. With proper edge isolation and joints at doorways, cracking is rare.

Do I need to be on site for the pour in Pinhoe?+

Not necessarily — we usually agree access with the main contractor or self-builder and run the pour with our own team. We'll confirm the Pinhoe access route, pump position and waste route before the day.

Do you offer a guarantee?+

Yes — as a Cemfloor-certified installer, qualifying jobs are backed by a 10-year manufacturer-supported guarantee.

Need Liquid Screed priced for Pinhoe?

Tell us the square metres and access notes. Most Pinhoe quotes go out the same day.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp