Underfloor Heating Screed · Devon

Underfloor Heating Screed Poured to SR1 in Pinhoe

When Pinhoe self-builders specify UFH, the screed is what makes the system efficient. We pump Cemfloor Therm directly around your pressure-tested pipework for full encapsulation.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Underfloor Heating Screed Poured to SR1 in Pinhoe

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

When Pinhoe self-builders specify UFH, the screed is what makes the system efficient. We pump Cemfloor Therm directly around your pressure-tested pipework for full encapsulation.

For Pinhoe UFH builds the typical sequence is: insulation board down, pipes clipped and pressure-tested, edge insulation in place, then we pump and level in a single visit.

Most of our Pinhoe jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Pinhoe sits Exeter (3 mi), and we work the surrounding villages on the same week's diary.

Underfloor Heating Screed in Pinhoe — how it works

We pour Cemfloor Therm liquid screed over your UFH pipes at 50mm above pipe (typically 65-75mm total over insulation), giving full pipe encapsulation, fast thermal response and a finished surface flat to SR1.

The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.

EX1 access, routes and logistics

County

Devon

District

Exeter

Postcode

EX1

Nearest city

Exeter (3 mi)

Nearest motorway

M5 (J29, ~2 mi)

Primary A-road

A30 / B3181

Local industries

Pinhoe Quarry, new-build housing

Common builds

large new-build estates, station-side flats

What Pinhoe builds usually need

  • Large new-build estates — a regular brief in Pinhoe
  • Station-side flats — a regular brief in Pinhoe
  • Small commercial units — a regular brief in Pinhoe
  • Pinhoe Quarry — a regular brief in Pinhoe
  • New-build housing — a regular brief in Pinhoe

Latest jobs across Devon

UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth
Self-build UFH pour near Tiverton
Self-build UFH pour near Tiverton
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter

Step-by-step for a Pinhoe job

  1. 1

    UFH installer fits manifold, pipes and pressure-tests to 6 bar

  2. 2

    We confirm edge insulation, DPM and pipe coverage depth

  3. 3

    Pump and level the screed with pipes still under pressure

  4. 4

    Slow commissioning of the heating — usually after 7 days, ramping per manufacturer spec

  5. 5

    Floor coverings once moisture is signed off and commissioning is complete

What backs our Pinhoe work

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Pinhoe-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Cemfloor systems for Pinhoe

Cemfloor Therm

Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.

PIR/Phenolic insulation board

70-150mm typical depending on build regs U-value target.

Edge insulation strip

Critical around UFH zones to allow thermal expansion.

Pressure-testing kit

Pipes held at 6 bar through the pour to flag any damage immediately.

Pinhoe screed questions, answered

Can you screed over wet UFH and electric UFH?+

Yes — Cemfloor Therm encapsulates both. Electric mat systems usually take a thinner cover; wet pipes need the 50mm minimum.

Does liquid UFH screed improve EPC ratings?+

Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.

When can I switch the underfloor heating on in Pinhoe?+

On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Pinhoe clients to the schedule.

What depth of screed over UFH pipes do you recommend?+

Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.

What if a pipe leaks during the pour?+

Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.

Will the screed crack as the UFH heats up?+

Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.

Need Underfloor Heating Screed priced for Pinhoe?

Tell us the square metres and access notes. Most Pinhoe quotes go out the same day.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp