Liquid Screed · Devon
Liquid Screed — Countess Wear, Devon
From Sowton Industrial Estate commercial floors to Topsham-side self-builds, liquid screed gives you one continuous slab with no shrinkage cracks and minimal curling.
Get a fixed price for Countess Wear, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
From Sowton Industrial Estate commercial floors to Topsham-side self-builds, liquid screed gives you one continuous slab with no shrinkage cracks and minimal curling.
We pump Cemfloor calcium-sulphate screed from a static mixer into your building, level it with a dappling bar, and walk away with a floor that's typically dry enough for floor coverings in roughly one day per millimetre of depth.
Most of our Countess Wear jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Countess Wear sits Exeter (3 mi), and we work the surrounding villages on the same week's diary.
Typical Countess Wear use cases
- Riverside semis — a regular brief in Countess Wear
- Sowton-edge offices — a regular brief in Countess Wear
- New flats — a regular brief in Countess Wear
- Sowton offices — a regular brief in Countess Wear
- Met Office support — a regular brief in Countess Wear
Who this is for in Countess Wear
Countess Wear runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.
Liquid Screed in Countess Wear — how it works
We pump Cemfloor calcium-sulphate screed from a static mixer into your building, level it with a dappling bar, and walk away with a floor that's typically dry enough for floor coverings in roughly one day per millimetre of depth.
The screed arrives ready-mixed on a truck, gets pumped through a hose to wherever it's needed in the building, and self-levels to within a couple of millimetres across the room. We spike-roll it to release air, then leave it.
Materials and systems we use in Countess Wear
Cemfloor CT-C30-F6
Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.
Cemfloor Therm
Optimised for underfloor heating with high thermal conductivity.
Acoustic and thermal insulation underlay
PIR, EPS or acoustic mat depending on the build-up.
Edge isolation strip
10mm closed-cell foam to allow thermal movement.
What to expect on pour day in Countess Wear
- 1
Site visit and written quote — confirm depths, area, access, build-up
- 2
We prep edge insulation, polythene DPM and any UFH coordination
- 3
Pump day: ready-mixed screed pumped, levelled and spike-rolled in one pour
- 4
Cover and protect for 24-48 hours
- 5
Light foot traffic from day 2; floor coverings once moisture content is signed off
Latest jobs across Devon



Within easy reach of Countess Wear
What backs our Countess Wear work
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J30, ~2 mi) access window and A379 traffic patterns
Countess Wear screed questions, answered
What's the cost difference vs traditional screed?+
Per square metre liquid screed is a little more expensive, but the labour saving, speed and flatness usually make total project cost lower — especially on larger Countess Wear jobs.
How quickly can I walk on a liquid screed floor in Countess Wear?+
Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific Countess Wear job.
Can liquid screed go over an existing concrete slab?+
Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the Countess Wear site visit.
Can you pour in cold weather?+
Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any Countess Wear pour in the colder months.
Do I need to be on site for the pour in Countess Wear?+
Not necessarily — we usually agree access with the main contractor or self-builder and run the pour with our own team. We'll confirm the Countess Wear access route, pump position and waste route before the day.
Does liquid screed crack like sand-and-cement?+
Calcium-sulphate and modern cement-based liquid screeds have very low drying shrinkage. With proper edge isolation and joints at doorways, cracking is rare.
Book your Countess Wear pour
Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
