Devon Coverage

Laser-Flat Screed Floors Across Sowton

From Honiton Road to Sowton Industrial Estate, we run residential and commercial liquid screed pours with a small dedicated team.

From Honiton Road to Sowton Industrial Estate, we run residential and commercial liquid screed pours with a small dedicated team.

We're Sowton is Exeter's biggest commercial cluster on the M5 J29 doorstep — hangar-style flatness work. Our coverage runs across EX2, taking in Honiton Road and out toward Sowton Industrial Estate, with the M5 (J29, ~1 mi) on hand for materials and pump trucks.

Most of our Sowton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Sowton sits Exeter (3 mi), and we work the surrounding villages on the same week's diary.

Sowton projects we see most

  • Office parks — a regular brief in Sowton
  • Distribution warehouses — a regular brief in Sowton
  • Hotel buildings — a regular brief in Sowton
  • Met Office support — a regular brief in Sowton
  • Distribution — a regular brief in Sowton

Right fit for Sowton contractors and developers

Sowton skews commercial — trade parks like Sowton Industrial Estate, contractor-led fit-outs, and developer estates. We price as a sub-contractor on programme, with RAMS and CDM documentation issued ahead of mobilisation.

Liquid screed in Sowton — how it works

We pour Cemfloor liquid screed at SR1 flatness, pumping straight off the truck into the building. No hand-trowelled bays, no cold joints, ready for trades back on the floor in 48 hours.

Build-up is straightforward: insulation, DPM, edge isolation, pour. We handle the lot or we work to the main contractor's substrate — whichever suits your Sowton job.

Specifications suited to Sowton builds

Cemfloor CT-C30-F6

Cement-based liquid screed — robust, low-shrinkage, fast-drying.

Cemfloor Therm

Thermally-optimised for UFH.

PIR insulation + DPM

Build-up tuned to your build regs U-value.

How a Sowton pour runs

  1. 1

    Site visit and written quote

  2. 2

    Prep — insulation, DPM, edge isolation, UFH coordination

  3. 3

    Pump day — single-visit pour, level and spike-roll

  4. 4

    Cover and cure for 24-48 hours

  5. 5

    Moisture-test sign-off, floor coverings

Latest jobs across Devon

Estuary-side residential retrofit in Topsham
Estuary-side residential retrofit in Topsham
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension

What backs our Sowton work

Hundreds of square metres poured around Sowton in the last 12 months

Single-team continuity — same crew, same standards, every job

Written fixed-price quotes — no day-rate creep

Moisture-test handover record so flooring contractors take the slab on without dispute

Sowton screed questions, answered

Do you handle the insulation and DPM?+

Yes if you want a single sub on the floor build-up, or no if your main contractor has it covered. Either works for Sowton jobs.

Do you handle UFH coordination?+

Yes — we work with whichever UFH installer is on your Sowton project and align dates with their pressure-test schedule.

Can you give a fixed-price quote?+

Yes — every Sowton quote is a written fixed price against a defined scope. No day-rate surprises.

How long does the floor take to dry in Sowton?+

Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your Sowton pour.

Do you cover Sowton?+

Yes — Sowton sits inside our regular 30-mile working radius and we have active diary there most months.

Do you offer a guarantee?+

As a Cemfloor-certified installer, qualifying installs are backed by a 10-year manufacturer-supported guarantee.

Get a Sowton liquid screed quote

Send us the floor area and target dates — fixed-price quote back the same day on most Sowton jobs.