Garage Floor Screed · Devon

Garage Floor Screed — Silverton, Devon

Whether you're future-proofing a Silverton garage for an EV charger or finishing a workshop floor, liquid screed gives you the flatness and density coatings need to bond.

Cemfloor-certified work near Silverton

Manufacturer-backed install, ten-year guarantee, fully insured. Get a written quote.

Start a quote07791 510849 WhatsApp us
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Garage Floor Screed — Silverton, Devon

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Whether you're future-proofing a Silverton garage for an EV charger or finishing a workshop floor, liquid screed gives you the flatness and density coatings need to bond.

For Silverton garage conversions becoming habitable rooms, we'll also coordinate UFH and insulation build-up so the finished floor sits at the right level for thresholds.

Most of our Silverton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Silverton sits Exeter (10 mi), and we work the surrounding villages on the same week's diary.

Built for Silverton rural self-builders and farms

Silverton sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.

Local facts that shape every Silverton pour

County

Devon

District

Mid Devon

Postcode

EX5

Nearest city

Exeter (10 mi)

Nearest motorway

M5 (J28, ~7 mi)

Primary A-road

B3181 / A396

Local industries

historic paper mill, agriculture

Common builds

cob-and-thatch cottages, paper-mill-side conversions

Garage Floor Screed in Silverton — how it works

We assess the existing slab, prep with shot-blasting or grinding where needed, lay edge isolation and a DPM if unbonded, then pump and level the screed in a single visit.

Liquid screed over a garage slab leaves a surface flat enough for direct application of two-pack epoxy, polyurea or polyaspartic floor coatings — no further levelling compound required.

Step-by-step for a Silverton job

  1. 1

    Site visit — assess the existing slab, falls, thresholds

  2. 2

    Prep: clean, prime or lay DPM and insulation

  3. 3

    Pump and level in a single morning

  4. 4

    Cover for 24 hours, walk-on by day 2

  5. 5

    Coatings or floor finishes once dry — typically 7-14 days

Latest jobs across Devon

Garage floor refinished in Torquay
Garage floor refinished in Torquay
Large open-plan pour for a new-build near Cullompton
Large open-plan pour for a new-build near Cullompton
Self-build UFH pour near Tiverton
Self-build UFH pour near Tiverton

Cemfloor systems for Silverton

Cemfloor CT-C30-F6

Cement-based screed — robust, coating-ready surface.

Bonding primer

For bonded pours over existing slabs.

DPM and slip membrane

For unbonded over insulation or older slabs.

Shot-blasting / grinding prep

Where the existing slab needs surface profile.

Silverton screed questions, answered

Do you need to remove my existing garage floor?+

Usually no — if the existing slab is sound we bond directly to it from 30mm. We'll inspect first at the Silverton site visit.

Will it slope to a drain?+

Liquid screed self-levels — it won't form a fall. If you need a drain fall in your Silverton garage, we form it in the substrate first, then screed at constant thickness.

Can I finish the floor with epoxy?+

Absolutely — liquid screed gives you a flat, dense base that resin coatings bond to well once the screed is dry and the surface laitance is sanded off.

Can liquid screed take an EV charger and a car's weight in Silverton?+

Yes — a properly specified 40-50mm liquid screed easily handles domestic vehicle loads. We'll size the build-up to your Silverton garage usage.

What about cold garages — will it cure?+

We won't pour below 5°C. For winter jobs we'll either heat the space or schedule for a mild day in your Silverton diary.

Do you tidy up afterwards?+

Wash-out is bagged and removed. We leave the Silverton site clean and the floor protected with sheeting.

What backs our Silverton work

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Silverton-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Cemfloor-certified work near Silverton

Manufacturer-backed install, ten-year guarantee, fully insured. Get a written quote.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp