Liquid Screed · Devon

Liquid Screed — Silverton, Devon

Across Silverton we lay self-levelling Cemfloor screed at depths from 30mm, pumping straight off the truck and finishing to a true SR1 — no hand-trowelling, no cold joints.

Cemfloor-certified work near Silverton

Manufacturer-backed install, ten-year guarantee, fully insured. Get a written quote.

Start a quote07791 510849 WhatsApp us
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Silverton, Devon

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Across Silverton we lay self-levelling Cemfloor screed at depths from 30mm, pumping straight off the truck and finishing to a true SR1 — no hand-trowelling, no cold joints.

Liquid screed bonds into a single monolithic layer with no bays, no day joints and no need for steel mesh — it's poured around any UFH pipework you've already pressure-tested.

Most of our Silverton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Silverton sits Exeter (10 mi), and we work the surrounding villages on the same week's diary.

Right fit for Silverton rural self-builders and farms

Silverton sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.

Why Silverton site context matters

County

Devon

District

Mid Devon

Postcode

EX5

Nearest city

Exeter (10 mi)

Nearest motorway

M5 (J28, ~7 mi)

Primary A-road

B3181 / A396

Local industries

historic paper mill, agriculture

Common builds

cob-and-thatch cottages, paper-mill-side conversions

Liquid Screed in Silverton — how it works

Liquid screed bonds into a single monolithic layer with no bays, no day joints and no need for steel mesh — it's poured around any UFH pipework you've already pressure-tested.

Unlike a traditional sand-and-cement screed, you'll be back on the floor in 24-48 hours rather than a week, and the surface is flat enough to lay LVT or large-format tile without further latex.

How a Silverton pour runs

  1. 1

    Site visit and written quote — confirm depths, area, access, build-up

  2. 2

    We prep edge insulation, polythene DPM and any UFH coordination

  3. 3

    Pump day: ready-mixed screed pumped, levelled and spike-rolled in one pour

  4. 4

    Cover and protect for 24-48 hours

  5. 5

    Light foot traffic from day 2; floor coverings once moisture content is signed off

Silverton-area projects

Large open-plan pour for a new-build near Cullompton
Large open-plan pour for a new-build near Cullompton
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension

Specifications suited to Silverton builds

Cemfloor CT-C30-F6

Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.

Cemfloor Therm

Optimised for underfloor heating with high thermal conductivity.

Acoustic and thermal insulation underlay

PIR, EPS or acoustic mat depending on the build-up.

Edge isolation strip

10mm closed-cell foam to allow thermal movement.

What people in Silverton usually ask

Does liquid screed crack like sand-and-cement?+

Calcium-sulphate and modern cement-based liquid screeds have very low drying shrinkage. With proper edge isolation and joints at doorways, cracking is rare.

How quickly can I walk on a liquid screed floor in Silverton?+

Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific Silverton job.

Can you pour in cold weather?+

Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any Silverton pour in the colder months.

Can liquid screed go over an existing concrete slab?+

Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the Silverton site visit.

Do I need to be on site for the pour in Silverton?+

Not necessarily — we usually agree access with the main contractor or self-builder and run the pour with our own team. We'll confirm the Silverton access route, pump position and waste route before the day.

Do you offer a guarantee?+

Yes — as a Cemfloor-certified installer, qualifying jobs are backed by a 10-year manufacturer-supported guarantee.

Why Silverton clients pick us

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Silverton-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Cemfloor-certified work near Silverton

Manufacturer-backed install, ten-year guarantee, fully insured. Get a written quote.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp