For specifiers

Liquid Screed Specification Notes for Architects

For architects and designers writing liquid screed into a build-up — the practical detail behind the datasheet.

Free quote · No obligation

Get your specification reviewed

Name, phone, email — we'll reply the same working day with a fixed price.

Call now
Same-day reply
Fully insured
5★ reviewed

Liquid screed now appears in the majority of residential and light-commercial floor build-ups we see specified across Devon and Somerset, but the level of detail in the specification varies enormously — from a precise product-and-depth callout to a generic "liquid screed to manufacturer's instructions" note that leaves a lot to be resolved on site.

This page sets out the practical points worth nailing down at specification stage, based on what we most often end up clarifying with contractors after the drawings are issued.

It's written as a working reference, not a replacement for the manufacturer's own technical literature, which should always be the primary source for a formal specification clause.

Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension

What a robust specification clause should state

  • Named product (e.g. Cemfloor CT-C30-F6, Gyvlon Thermio+) rather than just "liquid screed"
  • Minimum depth and whether it's bonded or unbonded, referenced to a specific detail drawing
  • Flatness tolerance required (e.g. SR1) where it affects the finished floor covering
  • Moisture content threshold required before handover, matched to the intended floor finish
  • Movement joint locations and detailing at junctions and large floor plates

Common specification gaps we resolve on site

Gap in the drawingWhat we typically need clarified
No named productWhich manufacturer and mix, since datasheets vary in cover depth and drying rate
No stated flatness toleranceWhether SR1 is required, particularly under large-format tile or resin
UFH shown without cover depthMinimum cover to the top of pipe for the screed being used
No movement joint detail on a large floor plateJoint locations, particularly across thresholds or between zones
Free quote · No obligation

Get your specification reviewed

Send us your proposed build-up or draft specification clause and we'll flag anything worth tightening before issue.

Call now
Same-day reply
Fully insured
5★ reviewed

Cement-based vs calcium-sulphate at specification stage

Specify cement-based (Cemfloor) when…

  • Wet areas or tiling are part of the build-up
  • Low-depth cover over UFH is critical
  • A cement-compatible substrate is required for a following finish

Specify calcium-sulphate (anhydrite) when…

  • Purely dry residential zones with engineered wood or LVT
  • Cost per m³ is a significant design driver
  • Deeper pours with less time pressure on drying

Working with us at RIBA Stage 4 or later

We're happy to review a proposed screed build-up before it's issued for tender or construction, flagging anything likely to cause a query on site — this is usually a faster route to a clean specification than resolving ambiguities after the drawings are already out.

Specification for Architects — questions we get asked

Get your specification reviewed

Send us your proposed build-up or draft specification clause and we'll flag anything worth tightening before issue.

Call now WhatsApp