For flooring trades

Handover Notes for Flooring Installers

If you're the flooring contractor picking up after us, here's the technical handover most installers ask for.

Free quote · No obligation

Request handover documentation

Name, phone, email — we'll reply the same working day with a fixed price.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

This page is aimed at flooring installers — LVT, engineered wood, carpet or resin — coming onto a job after we've poured and handed over a liquid screed floor. It's a quick technical reference rather than a full specification, covering the things we're most often asked about on handover calls.

If you need the underlying moisture data or product batch information for a specific job, we issue that as written documentation at handover — this page is general guidance, not a substitute for job-specific figures.

Get in touch directly if you need anything beyond what's covered here for a live project.

Screed type quick reference for flooring installers

Screed typeNotes for flooring
Cemfloor (cement-based)No mandatory laitance sanding for most mixes; prime per datasheet before flexible floor coverings
Gyvlon / Gypsol (anhydrite)Laitance sanding required; use a primer compatible with calcium-sulphate substrates
Either, over UFHConfirm commissioning heat-up has been completed per manufacturer guidance before covering

What we hand over at completion

  • Screed product, batch reference and poured depth
  • Written moisture test result and date of test
  • Any defects noted at handover and how they were resolved
  • Confirmation of UFH commissioning status where relevant
Free quote · No obligation

Request handover documentation

Get in touch for the written moisture test, batch reference and depth data for your specific job.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Points worth checking before you start

  • Confirm the moisture threshold required by your specific adhesive or underlay manufacturer against our test result
  • Check whether perimeter expansion gaps have been accounted for in the screed's edge-strip detailing
  • For resin or polished finishes, confirm surface preparation (grinding/shot-blasting) requirements separately, as these go beyond standard screed prep
  • Flag immediately if you find any surface contamination, cracking or inconsistency not noted on our handover sheet

A note on moisture thresholds

Different floor coverings and adhesive systems have different acceptable moisture thresholds — what's dry enough for LVT with a moisture-tolerant adhesive may not be dry enough for a solid wood floor. Always check your specific product's requirement against our written test figure rather than assuming a generic "screed is dry" sign-off covers every covering type.

Flooring Installer Notes — questions we get asked

Request handover documentation

Get in touch for the written moisture test, batch reference and depth data for your specific job.

Mobile Landline WhatsApp