Developers building across Sticklepath need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Get a fixed price for New Build Screeding — Sticklepath, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Developers building across Sticklepath need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Output on a typical Sticklepath plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Most of our Sticklepath jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Sticklepath sits Exeter (18 mi), and we work the surrounding villages on the same week's diary.
Sticklepath projects we see most
- Granite cottages — a regular brief in Sticklepath
- Farmhouse conversions — a regular brief in Sticklepath
- Moor-edge new-builds — a regular brief in Sticklepath
- Annex extensions — a regular brief in Sticklepath
- Upland farming — a regular brief in Sticklepath
Right fit for Sticklepath rural self-builders and farms
Sticklepath sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
New Build Screeding in Sticklepath — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Sticklepath scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Sticklepath development moves through screed without a gap in the build sequence.
Specifications suited to Sticklepath builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
How a Sticklepath pour runs
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Floors poured around Sticklepath



Nearby villages and towns
Proof from the Devon workload
Common Sticklepath build questions
Can you work to our build programme rather than your own diary?+
Yes, that's the point of new build screeding, we plan crew and pump mobilisation around your plot handover dates, not the other way round.
Do you provide RAMS for a new build site in Sticklepath?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How many plots can you screed per day on a Sticklepath development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you price the whole Sticklepath site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Can you scale up if the Sticklepath programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Cemfloor-certified plot screeding near Sticklepath
Manufacturer-backed installs, per-plot moisture records and a ten-year guarantee on qualifying units.