New Build Screeding · Devon
Bow New Build Screeding Specialists
New build sites in Bow run to a programme, not a wish list, and screed is usually the trade holding up everything behind it. We sequence plot by plot so your follow-on trades never sit idle.
Screeding a new build site in Bow?
Send us the plot count, floor areas and target handover dates, and we'll come back with a development-wide fixed price.
Get a Bow programme quote07791 510849 WhatsApp usGet a fixed price for Bow New Build Screeding Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
New build sites in Bow run to a programme, not a wish list, and screed is usually the trade holding up everything behind it. We sequence plot by plot so your follow-on trades never sit idle.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Bow site rather than a new quote for every unit.
Most of our Bow jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Bow sits Exeter (15 mi), and we work the surrounding villages on the same week's diary.
Right fit for Bow rural self-builders and farms
Bow sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Why Bow site context matters
County
Devon
District
Mid Devon
Postcode
EX17
Nearest city
Exeter (15 mi)
Nearest motorway
M5 (J27, ~10 mi)
Primary A-road
A3072
Local industries
agriculture, equestrian yards
Common builds
stone farmhouses, barn conversions
New Build Screeding in Bow — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Bow scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Bow development moves through screed without a gap in the build sequence.
How a Bow pour runs
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Floors poured around Bow



Specifications suited to Bow builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Nearby villages and towns
Common Bow build questions
Can you work to our build programme rather than your own diary?+
Yes, that's the point of new build screeding, we plan crew and pump mobilisation around your plot handover dates, not the other way round.
How many plots can you screed per day on a Bow development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Do you provide RAMS for a new build site in Bow?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Can you scale up if the Bow programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Bow site come out to the same depth and finish.
Proof from the Devon workload
Screeding a new build site in Bow?
Send us the plot count, floor areas and target handover dates, and we'll come back with a development-wide fixed price.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
