Liquid Screed · Devon

Bow Liquid Screed Specialists

Liquid screed in Bow solves what sand-and-cement struggles with — SR1 flatness in a single pour, ready for tilers and joiners within days rather than weeks.

Ready for a laser-flat floor in Bow?

Send us the floor area, build-up and target dates — we'll come back with a fixed quote and a date.

Get a Bow quote07791 510849 WhatsApp us
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Bow Liquid Screed Specialists

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Liquid screed in Bow solves what sand-and-cement struggles with — SR1 flatness in a single pour, ready for tilers and joiners within days rather than weeks.

The screed arrives ready-mixed on a truck, gets pumped through a hose to wherever it's needed in the building, and self-levels to within a couple of millimetres across the room. We spike-roll it to release air, then leave it.

Most of our Bow jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Bow sits Exeter (15 mi), and we work the surrounding villages on the same week's diary.

Built for Bow rural self-builders and farms

Bow sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.

EX17 access, routes and logistics

County

Devon

District

Mid Devon

Postcode

EX17

Nearest city

Exeter (15 mi)

Nearest motorway

M5 (J27, ~10 mi)

Primary A-road

A3072

Local industries

agriculture, equestrian yards

Common builds

stone farmhouses, barn conversions

Liquid Screed in Bow — how it works

We pump Cemfloor calcium-sulphate screed from a static mixer into your building, level it with a dappling bar, and walk away with a floor that's typically dry enough for floor coverings in roughly one day per millimetre of depth.

The screed arrives ready-mixed on a truck, gets pumped through a hose to wherever it's needed in the building, and self-levels to within a couple of millimetres across the room. We spike-roll it to release air, then leave it.

Step-by-step for a Bow job

  1. 1

    Site visit and written quote — confirm depths, area, access, build-up

  2. 2

    We prep edge insulation, polythene DPM and any UFH coordination

  3. 3

    Pump day: ready-mixed screed pumped, levelled and spike-rolled in one pour

  4. 4

    Cover and protect for 24-48 hours

  5. 5

    Light foot traffic from day 2; floor coverings once moisture content is signed off

Latest jobs across Devon

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension
Estuary-side residential retrofit in Topsham
Estuary-side residential retrofit in Topsham

Cemfloor systems for Bow

Cemfloor CT-C30-F6

Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.

Cemfloor Therm

Optimised for underfloor heating with high thermal conductivity.

Acoustic and thermal insulation underlay

PIR, EPS or acoustic mat depending on the build-up.

Edge isolation strip

10mm closed-cell foam to allow thermal movement.

Bow screed questions, answered

What depth do you lay to?+

30mm minimum bonded, 35-40mm unbonded, 50mm+ over UFH pipes. We'll spec the right depth for your Bow build-up.

Can you pour in cold weather?+

Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any Bow pour in the colder months.

How quickly can I walk on a liquid screed floor in Bow?+

Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific Bow job.

Can liquid screed go over an existing concrete slab?+

Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the Bow site visit.

Do you offer a guarantee?+

Yes — as a Cemfloor-certified installer, qualifying jobs are backed by a 10-year manufacturer-supported guarantee.

Does liquid screed crack like sand-and-cement?+

Calcium-sulphate and modern cement-based liquid screeds have very low drying shrinkage. With proper edge isolation and joints at doorways, cracking is rare.

What backs our Bow work

Backed by 5★ Google and Yell reviews from across Devon
Same-day quotes on most residential jobs
10-year Cemfloor manufacturer-supported guarantee on qualifying installs
Direct relationships with local insulation and UFH suppliers — fewer middlemen, fewer surprises

Ready for a laser-flat floor in Bow?

Send us the floor area, build-up and target dates — we'll come back with a fixed quote and a date.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp