Underfloor Heating Screed · Devon
Bow Underfloor Heating Screed Specialists
Underfloor heating only works as well as the screed encasing it — and in Bow that means a high-thermal-conductivity liquid pour that wraps every pipe with no voids.
Ready for a laser-flat floor in Bow?
Send us the floor area, build-up and target dates — we'll come back with a fixed quote and a date.
Get a Bow quote07791 510849 WhatsApp usGet a fixed price for Bow Underfloor Heating Screed Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Underfloor heating only works as well as the screed encasing it — and in Bow that means a high-thermal-conductivity liquid pour that wraps every pipe with no voids.
The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.
Most of our Bow jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Bow sits Exeter (15 mi), and we work the surrounding villages on the same week's diary.
Who this is for in Bow
Bow sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
EX17 access, routes and logistics
County
Devon
District
Mid Devon
Postcode
EX17
Nearest city
Exeter (15 mi)
Nearest motorway
M5 (J27, ~10 mi)
Primary A-road
A3072
Local industries
agriculture, equestrian yards
Common builds
stone farmhouses, barn conversions
Underfloor Heating Screed in Bow — how it works
The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.
For Bow UFH builds the typical sequence is: insulation board down, pipes clipped and pressure-tested, edge insulation in place, then we pump and level in a single visit.
What to expect on pour day in Bow
- 1
UFH installer fits manifold, pipes and pressure-tests to 6 bar
- 2
We confirm edge insulation, DPM and pipe coverage depth
- 3
Pump and level the screed with pipes still under pressure
- 4
Slow commissioning of the heating — usually after 7 days, ramping per manufacturer spec
- 5
Floor coverings once moisture is signed off and commissioning is complete
Recent work near Bow



Materials and systems we use in Bow
Cemfloor Therm
Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.
PIR/Phenolic insulation board
70-150mm typical depending on build regs U-value target.
Edge insulation strip
Critical around UFH zones to allow thermal expansion.
Pressure-testing kit
Pipes held at 6 bar through the pour to flag any damage immediately.
Bow-area service radius
FAQs from Bow clients
When can I switch the underfloor heating on in Bow?+
On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Bow clients to the schedule.
What depth of screed over UFH pipes do you recommend?+
Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.
What if a pipe leaks during the pour?+
Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.
Does liquid UFH screed improve EPC ratings?+
Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.
Will the screed crack as the UFH heats up?+
Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.
How does this affect my floor coverings in Bow?+
Once commissioned and the floor moisture content is signed off (CM test, typically below 0.5% for tile), most coverings go down as normal. We hand you a commissioning record.
Trust points for a Bow brief
Ready for a laser-flat floor in Bow?
Send us the floor area, build-up and target dates — we'll come back with a fixed quote and a date.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
