New Build Screeding · Devon

New Build Screeding in Lapford

On multi-plot developments in Lapford we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

Multi-plot pours across EX17

From a handful of units to a full Lapford phase, we plan crew and pump around your build programme, not ours.

Request a quote07791 510849 WhatsApp us
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for New Build Screeding in Lapford

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

On multi-plot developments in Lapford we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Lapford scheme, so plot 1 and plot 40 come out identical.

Most of our Lapford jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Lapford sits Exeter (16 mi), and we work the surrounding villages on the same week's diary.

Right fit for Lapford homeowners and contractors alike

Lapford runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.

EX17 access, routes and logistics

County

Devon

District

Mid Devon

Postcode

EX17

Nearest city

Exeter (16 mi)

Nearest motorway

M5 (J31, ~19 mi)

Primary A-road

A377

Local industries

Ambrosia creamery, agriculture

Common builds

stone cottages, station-side new builds

New Build Screeding in Lapford — how it works

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Lapford scheme, so plot 1 and plot 40 come out identical.

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Lapford development moves through screed without a gap in the build sequence.

How a Lapford pour runs

  1. 1

    Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates

  2. 2

    Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot

  3. 3

    Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn

  4. 4

    Protect each plot for 24-48 hours while the crew moves on to the next

  5. 5

    Moisture testing and a written handover record issued per plot

  6. 6

    Snagging and any remedial work coordinated directly with the site manager before final trades move in

Floors poured around Lapford

Self-build UFH pour near Tiverton
Self-build UFH pour near Tiverton
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension

Specifications suited to Lapford builds

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

Common Lapford build questions

Can you work to our build programme rather than your own diary?+

Yes, that's the point of new build screeding, we plan crew and pump mobilisation around your plot handover dates, not the other way round.

Do you provide RAMS for a new build site in Lapford?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

How many plots can you screed per day on a Lapford development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Lapford site come out to the same depth and finish.

Can you scale up if the Lapford programme accelerates?+

Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.

Proof from the Devon workload

Hundreds of square metres poured around Lapford in the last 12 months

Single-team continuity — same crew, same standards, every job

Written fixed-price quotes — no day-rate creep

Moisture-test handover record so flooring contractors take the slab on without dispute

Multi-plot pours across EX17

From a handful of units to a full Lapford phase, we plan crew and pump around your build programme, not ours.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp