New Build Screeding · Devon
Chulmleigh New Build Screeding Specialists
On multi-plot developments in Chulmleigh we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
Get a fixed price for Chulmleigh New Build Screeding Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Chulmleigh we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Chulmleigh scheme, so plot 1 and plot 40 come out identical.
Most of our Chulmleigh jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Chulmleigh sits Barnstaple (17 mi), and we work the surrounding villages on the same week's diary.
New Build Screeding in Chulmleigh — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Chulmleigh scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Chulmleigh development moves through screed without a gap in the build sequence.
What we plan around in Chulmleigh
County
Devon
District
North Devon
Postcode
EX18
Nearest city
Barnstaple (17 mi)
Nearest motorway
M5 (J27, ~40 mi)
Primary A-road
A377
Local industries
independent retail, market-town hospitality
Common builds
Georgian townhouses, stone cottages
Where liquid screed earns its keep in Chulmleigh
- Georgian townhouses — a regular brief in Chulmleigh
- Stone cottages — a regular brief in Chulmleigh
- Small new-build estates — a regular brief in Chulmleigh
- High-street shop retrofits — a regular brief in Chulmleigh
- Independent retail — a regular brief in Chulmleigh
Floors poured around Chulmleigh



How a Chulmleigh pour runs
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Proof from the Devon workload
Hundreds of square metres poured around Chulmleigh in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Adjacent areas — usually same-week diary
Specifications suited to Chulmleigh builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Common Chulmleigh build questions
Can you work to our build programme rather than your own diary?+
Yes, that's the point of new build screeding, we plan crew and pump mobilisation around your plot handover dates, not the other way round.
Do you provide RAMS for a new build site in Chulmleigh?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
How many plots can you screed per day on a Chulmleigh development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Can you scale up if the Chulmleigh programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Do you price the whole Chulmleigh site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Multi-plot pours across EX18
From a handful of units to a full Chulmleigh phase, we plan crew and pump around your build programme, not ours.