New Build Screeding · Devon

New Build Screeding Poured to SR1 in Dolton

Developers building across Dolton need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for New Build Screeding Poured to SR1 in Dolton

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Developers building across Dolton need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.

Output on a typical Dolton plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.

Most of our Dolton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Dolton sits Barnstaple (18 mi), and we work the surrounding villages on the same week's diary.

Where liquid screed earns its keep in Dolton

  • Stone farmhouses — a regular brief in Dolton
  • Barn conversions — a regular brief in Dolton
  • Cottage extensions — a regular brief in Dolton
  • Occasional new-build cottages — a regular brief in Dolton
  • Agriculture — a regular brief in Dolton

Right fit for Dolton rural self-builders and farms

Dolton sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.

New Build Screeding in Dolton — how it works

Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Dolton site rather than a new quote for every unit.

Output on a typical Dolton plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.

Specifications suited to Dolton builds

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

How a Dolton pour runs

  1. 1

    Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates

  2. 2

    Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot

  3. 3

    Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn

  4. 4

    Protect each plot for 24-48 hours while the crew moves on to the next

  5. 5

    Moisture testing and a written handover record issued per plot

  6. 6

    Snagging and any remedial work coordinated directly with the site manager before final trades move in

Recent work near Dolton

Self-build UFH pour near Tiverton
Self-build UFH pour near Tiverton
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension

Trust points for a Dolton brief

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Dolton-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

FAQs from Dolton clients

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Do you provide RAMS for a new build site in Dolton?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

How many plots can you screed per day on a Dolton development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Dolton site come out to the same depth and finish.

Do you price the whole Dolton site or plot by plot?+

Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.

Can you scale up if the Dolton programme accelerates?+

Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.

Keep your Dolton plots on programme

Screed is often the trade holding up the schedule. Let's agree pump access and plot sequencing before it becomes a bottleneck.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp