New Build Screeding · Devon
Great Torrington New Build Screeding Specialists
On multi-plot developments in Great Torrington we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
Get a fixed price for Great Torrington New Build Screeding Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Great Torrington we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Great Torrington scheme, so plot 1 and plot 40 come out identical.
Most of our Great Torrington jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Great Torrington sits Barnstaple (12 mi), and we work the surrounding villages on the same week's diary.
New Build Screeding in Great Torrington — how it works
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Great Torrington site rather than a new quote for every unit.
Output on a typical Great Torrington plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
EX38 access, routes and logistics
County
Devon
District
Torridge
Postcode
EX38
Nearest city
Barnstaple (12 mi)
Nearest motorway
M5 (J27, ~50 mi)
Primary A-road
A386
Local industries
Dartington Crystal, agriculture
Common builds
Georgian terraces, Dartington Crystal works
What Great Torrington builds usually need
- Georgian terraces — a regular brief in Great Torrington
- Dartington Crystal works — a regular brief in Great Torrington
- New estates — a regular brief in Great Torrington
- Dartington Crystal — a regular brief in Great Torrington
- Agriculture — a regular brief in Great Torrington
Recent work near Great Torrington



How a Great Torrington pour runs
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Trust points for a Great Torrington brief
Hundreds of square metres poured around Great Torrington in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Great Torrington-area service radius
Specifications suited to Great Torrington builds
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
FAQs from Great Torrington clients
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
How many plots can you screed per day on a Great Torrington development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Do you provide RAMS for a new build site in Great Torrington?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
Can you scale up if the Great Torrington programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Do you price the whole Great Torrington site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Great Torrington site come out to the same depth and finish.
Coordinate UFH and screed across your Great Torrington plots
One agreed build-up, repeated consistently on every unit, with pressure-testing coordinated plot by plot.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
