New Build Screeding · Devon
Northam New Build Screeding Specialists
On multi-plot developments in Northam we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
Coordinate UFH and screed across your Northam plots
One agreed build-up, repeated consistently on every unit, with pressure-testing coordinated plot by plot.
Start the conversation07791 510849 WhatsApp usGet a fixed price for Northam New Build Screeding Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Northam we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Northam scheme, so plot 1 and plot 40 come out identical.
Most of our Northam jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Northam sits Barnstaple (12 mi), and we work the surrounding villages on the same week's diary.
Who this is for in Northam
Northam is a coastal town, so damp control, salt exposure and tight winter pour windows shape every brief. We work the diary around that — and around the holiday-let turnover that funds half the jobs here.
Why Northam site context matters
County
Devon
District
Torridge
Postcode
EX39
Nearest city
Barnstaple (12 mi)
Nearest motorway
M5 (J27, ~52 mi)
Primary A-road
A386
Local industries
tourism lets, harbour trades
Common builds
seafront apartments, 1930s coastal semis
New Build Screeding in Northam — how it works
Output on a typical Northam plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Northam scheme, so plot 1 and plot 40 come out identical.
What to expect on pour day in Northam
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Northam-area projects



Materials and systems we use in Northam
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Nearby villages and towns
What people in Northam usually ask
Do you price the whole Northam site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Northam?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How many plots can you screed per day on a Northam development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Can you scale up if the Northam programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Northam site come out to the same depth and finish.
Why Northam clients pick us
Hundreds of square metres poured around Northam in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Coordinate UFH and screed across your Northam plots
One agreed build-up, repeated consistently on every unit, with pressure-testing coordinated plot by plot.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.