Liquid screed pour near Instow New Build Screeding Specialists

New Build Screeding · Devon

Instow New Build Screeding Specialists

New build sites in Instow run to a programme, not a wish list, and screed is usually the trade holding up everything behind it. We sequence plot by plot so your follow-on trades never sit idle.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Instow New Build Screeding Specialists

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

New build sites in Instow run to a programme, not a wish list, and screed is usually the trade holding up everything behind it. We sequence plot by plot so your follow-on trades never sit idle.

Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Instow site rather than a new quote for every unit.

Most of our Instow jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Instow sits Barnstaple (8 mi), and we work the surrounding villages on the same week's diary.

Instow at a glance

County

Devon

District

North Devon

Postcode

EX39

Nearest city

Barnstaple (8 mi)

Nearest motorway

M5 (J27, ~50 mi)

Primary A-road

A39

Local industries

marine trades, hospitality

Common builds

quayside conversions, estuary-side new-builds

Typical Instow use cases

  • Quayside conversions — a regular brief in Instow
  • Estuary-side new-builds — a regular brief in Instow
  • Waterside retrofits — a regular brief in Instow
  • Boat-club buildings — a regular brief in Instow
  • Marine trades — a regular brief in Instow

New Build Screeding in Instow — how it works

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Instow scheme, so plot 1 and plot 40 come out identical.

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Instow development moves through screed without a gap in the build sequence.

Cemfloor systems for Instow

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

Floors poured around Instow

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth
Commercial pour at Heathfield, Newton Abbot
Commercial pour at Heathfield, Newton Abbot

Proof from the Devon workload

Backed by 5★ Google and Yell reviews from across Devon
Same-day quotes on most residential jobs
10-year Cemfloor manufacturer-supported guarantee on qualifying installs
Direct relationships with local insulation and UFH suppliers — fewer middlemen, fewer surprises

Common Instow build questions

What happens if a plot isn't ready when our crew arrives?+

We build flexibility into the plot sequence and communicate daily with the site manager, moving to the next ready plot rather than losing the day.

How many plots can you screed per day on a Instow development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

Do you provide RAMS for a new build site in Instow?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Instow site come out to the same depth and finish.

Do you price the whole Instow site or plot by plot?+

Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.

Instow developments reward a screed contractor who plans against the build programme, not just square metreage, agree the sequence once and every plot follows the same rhythm.

Multi-plot pours across EX39

From a handful of units to a full Instow phase, we plan crew and pump around your build programme, not ours.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp