New Build Screeding · Devon
New Build Screeding in Drewsteignton
On multi-plot developments in Drewsteignton we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
Get a fixed price for New Build Screeding in Drewsteignton
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Drewsteignton we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Drewsteignton scheme, so plot 1 and plot 40 come out identical.
Most of our Drewsteignton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Drewsteignton sits Exeter (13 mi), and we work the surrounding villages on the same week's diary.
New Build Screeding in Drewsteignton — how it works
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Drewsteignton development moves through screed without a gap in the build sequence.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Drewsteignton site rather than a new quote for every unit.
Drewsteignton at a glance
County
Devon
District
Teignbridge
Postcode
EX6
Nearest city
Exeter (13 mi)
Nearest motorway
M5 (J31, ~15 mi)
Primary A-road
A382
Local industries
upland farming, holiday lets
Common builds
granite cottages, farmhouse conversions
Typical Drewsteignton use cases
- Granite cottages — a regular brief in Drewsteignton
- Farmhouse conversions — a regular brief in Drewsteignton
- Moor-edge new-builds — a regular brief in Drewsteignton
- Annex extensions — a regular brief in Drewsteignton
- Upland farming — a regular brief in Drewsteignton
Latest jobs across Devon



Step-by-step for a Drewsteignton job
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
What backs our Drewsteignton work
Hundreds of square metres poured around Drewsteignton in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Within easy reach of Drewsteignton
Cemfloor systems for Drewsteignton
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Drewsteignton screed questions, answered
How quickly can follow-on trades get back onto a plot?+
Liquid screed allows light foot traffic from 24-48 hours per plot, which is why most Drewsteignton developers specify it over traditional screed on programme-driven builds.
Do you provide RAMS for a new build site in Drewsteignton?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How many plots can you screed per day on a Drewsteignton development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Can you scale up if the Drewsteignton programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Do you price the whole Drewsteignton site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Screeding a new build site in Drewsteignton?
Send us the plot count, floor areas and target handover dates, and we'll come back with a development-wide fixed price.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
