New Build Screeding · Devon
New Build Screeding in Chagford
On multi-plot developments in Chagford we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.

Get a fixed price for New Build Screeding in Chagford
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
On multi-plot developments in Chagford we pump several units in a single visit, tracking square metres per day against your site manager's schedule so plasterers, kitchen fitters and flooring contractors move in on time.
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Chagford scheme, so plot 1 and plot 40 come out identical.
Most of our Chagford jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Chagford sits Exeter (20 mi), and we work the surrounding villages on the same week's diary.
Local facts that shape every Chagford pour
County
Devon
District
West Devon
Postcode
TQ13
Nearest city
Exeter (20 mi)
Nearest motorway
M5 (J31, ~22 mi)
Primary A-road
minor B-roads
Local industries
high-end residential, hospitality
Common builds
granite stannary cottages, premium self-builds
New Build Screeding in Chagford — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Chagford scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Chagford development moves through screed without a gap in the build sequence.
Built for Chagford rural self-builders and farms
Chagford sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Cemfloor systems for Chagford
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Floors poured around Chagford



Proof from the Devon workload
Hundreds of square metres poured around Chagford in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Common Chagford build questions
What happens if a plot isn't ready when our crew arrives?+
We build flexibility into the plot sequence and communicate daily with the site manager, moving to the next ready plot rather than losing the day.
How many plots can you screed per day on a Chagford development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Do you provide RAMS for a new build site in Chagford?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you price the whole Chagford site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Chagford site come out to the same depth and finish.
Other areas we cover near Chagford
Whether it's a handful of units or a full rural self-builders and farms phase in Chagford, the aim is consistent, plot after plot flat, dried on schedule, handed over with its own written record.
Screeding a new build site in Chagford?
Send us the plot count, floor areas and target handover dates, and we'll come back with a development-wide fixed price.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
