Devon Coverage

Sticklepath Liquid Screed Specialists

Across Sticklepath and the EX20 postcode area, we lay laser-flat liquid screed for homeowners, self-builders and main contractors.

Across Sticklepath and the EX20 postcode area, we lay laser-flat liquid screed for homeowners, self-builders and main contractors.

We're Sticklepath is a moor-edge parish where access, insulation and thermal mass shape every pour. Our coverage runs across EX20, taking in Belstone-side and out toward Finch Foundry trades, with the M5 (J31, ~20 mi) on hand for materials and pump trucks.

Most of our Sticklepath jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Sticklepath sits Exeter (18 mi), and we work the surrounding villages on the same week's diary.

Sticklepath projects we see most

  • Granite cottages — a regular brief in Sticklepath
  • Farmhouse conversions — a regular brief in Sticklepath
  • Moor-edge new-builds — a regular brief in Sticklepath
  • Annex extensions — a regular brief in Sticklepath
  • Upland farming — a regular brief in Sticklepath

Right fit for Sticklepath rural self-builders and farms

Sticklepath sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.

Liquid screed in Sticklepath — how it works

We pour Cemfloor liquid screed at SR1 flatness, pumping straight off the truck into the building. No hand-trowelled bays, no cold joints, ready for trades back on the floor in 48 hours.

Build-up is straightforward: insulation, DPM, edge isolation, pour. We handle the lot or we work to the main contractor's substrate — whichever suits your Sticklepath job.

Specifications suited to Sticklepath builds

Cemfloor CT-C30-F6

Cement-based liquid screed — robust, low-shrinkage, fast-drying.

Cemfloor Therm

Thermally-optimised for UFH.

PIR insulation + DPM

Build-up tuned to your build regs U-value.

How a Sticklepath pour runs

  1. 1

    Site visit and written quote

  2. 2

    Prep — insulation, DPM, edge isolation, UFH coordination

  3. 3

    Pump day — single-visit pour, level and spike-roll

  4. 4

    Cover and cure for 24-48 hours

  5. 5

    Moisture-test sign-off, floor coverings

Sticklepath-area projects

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension
Commercial pour at Heathfield, Newton Abbot
Commercial pour at Heathfield, Newton Abbot

Why Sticklepath clients pick us

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Sticklepath-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

What people in Sticklepath usually ask

Do you handle the insulation and DPM?+

Yes if you want a single sub on the floor build-up, or no if your main contractor has it covered. Either works for Sticklepath jobs.

Do you offer a guarantee?+

As a Cemfloor-certified installer, qualifying installs are backed by a 10-year manufacturer-supported guarantee.

Do you handle UFH coordination?+

Yes — we work with whichever UFH installer is on your Sticklepath project and align dates with their pressure-test schedule.

Can you give a fixed-price quote?+

Yes — every Sticklepath quote is a written fixed price against a defined scope. No day-rate surprises.

How long does the floor take to dry in Sticklepath?+

Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your Sticklepath pour.

Do you cover Sticklepath?+

Yes — Sticklepath sits inside our regular 30-mile working radius and we have active diary there most months.

Cemfloor screed across EX20

From Sticklepath to the surrounding villages, one team, one fixed price.

Call now · 07765 712609