Devon Coverage
South Zeal's Cemfloor-Certified Screed Team
Liquid screed in South Zeal solves the flatness, speed and UFH-response problems that traditional sand-and-cement can't.
Talk to a South Zeal-area screeder
Diary fills 2-4 weeks ahead — pin a date and we'll confirm logistics.
Call 07765 71260907765 712609Liquid screed in South Zeal solves the flatness, speed and UFH-response problems that traditional sand-and-cement can't.
We're South Zeal is a moor-edge parish where access, insulation and thermal mass shape every pour. Our coverage runs across EX20, taking in Ramsley and out toward , with the M5 (J31, ~19 mi) on hand for materials and pump trucks.
Most of our South Zeal jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. South Zeal sits Exeter (17 mi), and we work the surrounding villages on the same week's diary.
Built for South Zeal rural self-builders and farms
South Zeal sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
South Zeal at a glance
County
Devon
District
West Devon
Postcode
EX20
Nearest city
Exeter (17 mi)
Nearest motorway
M5 (J31, ~19 mi)
Primary A-road
A30
Local industries
upland farming, holiday lets
Common builds
granite cottages, farmhouse conversions
Liquid screed in South Zeal — how it works
Build-up is straightforward: insulation, DPM, edge isolation, pour. We handle the lot or we work to the main contractor's substrate — whichever suits your South Zeal job.
On larger South Zeal jobs we mobilise a static mixer; on residential we use ready-mix delivery and a smaller pump. Either way, the finished floor reads the same.
Step-by-step for a South Zeal job
- 1
Site visit and written quote
- 2
Prep — insulation, DPM, edge isolation, UFH coordination
- 3
Pump day — single-visit pour, level and spike-roll
- 4
Cover and cure for 24-48 hours
- 5
Moisture-test sign-off, floor coverings
Latest jobs across Devon



Cemfloor systems for South Zeal
Cemfloor CT-C30-F6
Cement-based liquid screed — robust, low-shrinkage, fast-drying.
Cemfloor Therm
Thermally-optimised for UFH.
PIR insulation + DPM
Build-up tuned to your build regs U-value.
Within easy reach of South Zeal
South Zeal screed questions, answered
Are you fully insured?+
Yes — public liability, employers' liability and CAR cover, with certificates available on request for any South Zeal site.
Do you offer a guarantee?+
As a Cemfloor-certified installer, qualifying installs are backed by a 10-year manufacturer-supported guarantee.
Do you cover South Zeal?+
Yes — South Zeal sits inside our regular 30-mile working radius and we have active diary there most months.
How long does the floor take to dry in South Zeal?+
Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your South Zeal pour.
Can you give a fixed-price quote?+
Yes — every South Zeal quote is a written fixed price against a defined scope. No day-rate surprises.
Do you handle UFH coordination?+
Yes — we work with whichever UFH installer is on your South Zeal project and align dates with their pressure-test schedule.
What backs our South Zeal work
Talk to a South Zeal-area screeder
Diary fills 2-4 weeks ahead — pin a date and we'll confirm logistics.
