Traditional Sand & Cement Screed · Devon
Traditional Sand & Cement Screed — Sticklepath, Devon
Sticklepath builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.
Get a fixed price for Traditional Sand & Cement Screed — Sticklepath, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Sticklepath builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.
Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.
Most of our Sticklepath jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Sticklepath sits Exeter (18 mi), and we work the surrounding villages on the same week's diary.
What Sticklepath builds usually need
- Granite cottages — a regular brief in Sticklepath
- Farmhouse conversions — a regular brief in Sticklepath
- Moor-edge new-builds — a regular brief in Sticklepath
- Annex extensions — a regular brief in Sticklepath
- Upland farming — a regular brief in Sticklepath
Built for Sticklepath rural self-builders and farms
Sticklepath sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Traditional Sand & Cement Screed in Sticklepath — how it works
Unlike a self-levelling liquid screed, sand and cement is placed and compacted by hand, so we control the fall towards a drain, form an upstand at a threshold, or feather it into an existing floor level in a way a pumped pour cannot.
Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.
Cemfloor systems for Sticklepath
Sand and cement (typically 4:1 or 5:1 mix)
Semi-dry, hand-compacted mix ratio adjusted to depth and loading.
SBR bonding agent
Slurry-brushed onto the substrate for bonded screeds under 40mm.
Polypropylene fibre reinforcement
Added to reduce shrinkage cracking on larger bays.
DPM and separating membrane
For unbonded or floating screeds over insulation.
Falls formed to drain outlets
Built into the screed thickness for wet rooms and balconies.
Edge and movement joints
Set at bay lines, doorways and around columns.
Step-by-step for a Sticklepath job
- 1
Site visit to assess substrate, falls, depth and access, since sand and cement can be barrowed where a pump truck cannot reach
- 2
Substrate prep, priming or DPM, and setting out of bay lines and laser levels
- 3
Mix and place the screed in bays, compacting as we go to remove voids
- 4
Hand float or power trowel to a flat, dense SR2 finish
- 5
Protect and allow to cure, typically a day per millimetre of depth after the first 50mm
- 6
Follow-up inspection before floor coverings or tiling begin
Recent work near Sticklepath



Sticklepath-area service radius
Trust points for a Sticklepath brief
FAQs from Sticklepath clients
How is sand and cement screed different from liquid screed in Sticklepath?+
Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.
What SR rating do you achieve on a trowelled screed?+
We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.
Will the screed crack?+
Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Sticklepath job.
Do you use a screed pump for sand and cement in Sticklepath?+
On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.
How long does a sand and cement screed take to dry in Sticklepath?+
Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.
Can you match an existing sand and cement floor level?+
Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.
Fixed-price sand and cement screed near Sticklepath
One quote covers prep, mix, lay and finish. No day-rate surprises on your Sticklepath job.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
