Garage Floor Screed · Devon
Garage Floor Screed — Sticklepath, Devon
Whether you're future-proofing a Sticklepath garage for an EV charger or finishing a workshop floor, liquid screed gives you the flatness and density coatings need to bond.
Get a fixed price for Garage Floor Screed — Sticklepath, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Whether you're future-proofing a Sticklepath garage for an EV charger or finishing a workshop floor, liquid screed gives you the flatness and density coatings need to bond.
For Sticklepath garage conversions becoming habitable rooms, we'll also coordinate UFH and insulation build-up so the finished floor sits at the right level for thresholds.
Most of our Sticklepath jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Sticklepath sits Exeter (18 mi), and we work the surrounding villages on the same week's diary.
Sticklepath projects we see most
- Granite cottages — a regular brief in Sticklepath
- Farmhouse conversions — a regular brief in Sticklepath
- Moor-edge new-builds — a regular brief in Sticklepath
- Annex extensions — a regular brief in Sticklepath
- Upland farming — a regular brief in Sticklepath
Right fit for Sticklepath rural self-builders and farms
Sticklepath sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Garage Floor Screed in Sticklepath — how it works
For Sticklepath garage conversions becoming habitable rooms, we'll also coordinate UFH and insulation build-up so the finished floor sits at the right level for thresholds.
A typical Sticklepath single-garage floor of 18-24m² is poured and finished in well under a morning, with the pump set up on the driveway.
Specifications suited to Sticklepath builds
Cemfloor CT-C30-F6
Cement-based screed — robust, coating-ready surface.
Bonding primer
For bonded pours over existing slabs.
DPM and slip membrane
For unbonded over insulation or older slabs.
Shot-blasting / grinding prep
Where the existing slab needs surface profile.
How a Sticklepath pour runs
- 1
Site visit — assess the existing slab, falls, thresholds
- 2
Prep: clean, prime or lay DPM and insulation
- 3
Pump and level in a single morning
- 4
Cover for 24 hours, walk-on by day 2
- 5
Coatings or floor finishes once dry — typically 7-14 days
Sticklepath-area projects



Nearby villages and towns
Why Sticklepath clients pick us
What people in Sticklepath usually ask
Is it noisier than sand-and-cement?+
Pump day is loud for an hour or two while the truck and pump run on the driveway. After that, nothing.
Can liquid screed take an EV charger and a car's weight in Sticklepath?+
Yes — a properly specified 40-50mm liquid screed easily handles domestic vehicle loads. We'll size the build-up to your Sticklepath garage usage.
Can I finish the floor with epoxy?+
Absolutely — liquid screed gives you a flat, dense base that resin coatings bond to well once the screed is dry and the surface laitance is sanded off.
Will it slope to a drain?+
Liquid screed self-levels — it won't form a fall. If you need a drain fall in your Sticklepath garage, we form it in the substrate first, then screed at constant thickness.
What about cold garages — will it cure?+
We won't pour below 5°C. For winter jobs we'll either heat the space or schedule for a mild day in your Sticklepath diary.
Do you tidy up afterwards?+
Wash-out is bagged and removed. We leave the Sticklepath site clean and the floor protected with sheeting.
Cemfloor-certified work near Sticklepath
Manufacturer-backed install, ten-year guarantee, fully insured. Get a written quote.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
