Pour day looks calmer than it sounds — most of the visible action is compressed into a few hours once setup is done.

Free quote · No obligation

Get your pour day planned

Name, phone, email — we'll reply the same working day with a fixed price.

Call now
Same-day reply
Fully insured
5★ reviewed

If you've never seen a liquid screed pour before, the pace can be surprising: what took days to prepare (insulation, membrane, UFH) is poured, levelled and finished in a matter of hours. Knowing roughly what to expect helps if you're planning to be around, or need to arrange access for the crew.

The exact timing varies with job size and depth, but the sequence of events is consistent across almost every job we do.

Here's a realistic hour-by-hour picture for a typical residential pour.

Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension

A typical pour day, hour by hour

  1. 1

    Arrival and setup (first hour)

    Pump or mixer positioned, hose run laid out and protected through the property.

  2. 2

    Final pre-pour checks

    Datum levels confirmed, insulation and membrane given a final visual check, UFH pressure confirmed.

  3. 3

    Pouring

    Screed is pumped into the area, working from the far point back toward the exit, following the laser datum.

  4. 4

    Dappling and levelling

    The dappling bar breaks surface tension and helps the mix self-level to the datum lines.

  5. 5

    Spike-rolling

    A spiked roller releases trapped air from the surface for a sound, even finish.

  6. 6

    Protection and clear-down

    The poured area is barriered off, hoses and plant cleared, and no-traffic signage put up.

What to arrange on your side

  • Clear access along the agreed hose route the evening before
  • Somewhere off-site to be, or a way to avoid the pour area, for the day
  • Power and water available on site if agreed as part of the setup
  • Confirmation of who's on site to unlock doors and answer access questions
Free quote · No obligation

Get your pour day planned

We'll talk you through exactly what to expect and what to prepare before your specific pour date.

Call now
Same-day reply
Fully insured
5★ reviewed

Typical foot-traffic and next-trade timings after pouring

MilestoneTypical timing
No foot traffic at all24–48 hours
Careful foot traffic onlyAfter 48–72 hours, screed-dependent
Next trades (first fix, etc.)Once confirmed safe by us, usually within a few days
Floor coveringsOnce dried to the required moisture level — see our drying programme page

Pour Day Timeline — questions we get asked

Get your pour day planned

We'll talk you through exactly what to expect and what to prepare before your specific pour date.