Most delays or extra charges on pour day come down to one thing: the site wasn't quite as ready as everyone assumed. Insulation with a gap, a UFH manifold not yet pressure-tested, or a doorway blocked by a delivery of kitchen units can all mean a wasted crew visit.

None of this is complicated to get right — it just needs checking off deliberately before the day, ideally by whoever's managing the build programme as well as by us on our pre-pour inspection.

This is the checklist we run through, shared here so your builder or site manager can work to the same list.

Before we arrive, the site should have

  • Insulation boards fully laid, jointed and taped with no gaps
  • Damp-proof membrane installed, lapped and taped, turned up at the perimeter
  • Edge-strip foam fitted around the full perimeter and any upstands
  • UFH pipework clipped down to the design layout and pressure-tested
  • All other trades cleared from the pour area, with clean access maintained

Common prep issues and what they cause

Issue found on inspectionLikely consequence
Untaped membrane jointsDelay while it's fixed, or pour rescheduled
UFH not pressure-testedPour paused until testing is confirmed
Blocked access routeWasted crew time or a rescheduled visit
Missing edge-strip foamRisk of screed bonding to walls, cracking on movement
Free quote · No obligation

Get your pre-pour checklist confirmed

Share your build programme and we'll run through this checklist with your site team before the pour date is locked in.

Call now
Same-day reply
Fully insured
5★ reviewed

The order we check things in

  1. 1

    Walk the access route

    Confirm the hose run from road to pour area is clear.

  2. 2

    Inspect insulation and DPM

    Check joints, taping and perimeter detail.

  3. 3

    Confirm UFH status

    Verify pressure test and pipe layout against the manifold plan.

  4. 4

    Confirm datum levels

    Agree finish level with laser levels before mixing begins.

Site Preparation Checklist — questions we get asked

Get your pre-pour checklist confirmed

Share your build programme and we'll run through this checklist with your site team before the pour date is locked in.