Screed depth compared

30mm vs 50mm Liquid Screed Depth

The depth of your pour drives drying time, UFH response and floor loading capacity — it's not a number you should let slip by default.

Free quote · No obligation

Get your screed depth confirmed on survey

Name, phone, email — we'll reply the same working day with a fixed price.

Call now
Same-day reply
Fully insured
5★ reviewed

Screed depth gets specified early in a project, often before UFH loop centres or floor coverings are finalised, and it's one of the easiest numbers to get pinned down wrong. Go too thin and pipe cover or loading fails; go too thick and you add unnecessary drying time and cost.

30mm and 50mm are the two depths we see quoted most often for liquid screed, and they sit either side of a real performance line — 30mm is the minimum bonded depth for Cemfloor, while 50mm is the more typical unbonded UFH residential figure.

Here's how the two compare on the things that actually affect your programme and your finished floor.

UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth

30mm vs 50mm at a glance

Bonded, no UFH

30mm minimum use

Unbonded, UFH loops

50mm typical use

Roughly +2–3 weeks at 50mm

Drying difference

Higher at 50mm

Loading capacity

30mm vs 50mm side by side

Factor30mm vs 50mm
ApplicationBonded, direct to substrate vs unbonded, over insulation/separating membrane
UFH suitabilityNot viable with pipework vs standard for UFH cover
Drying to <75% RH~3–4 weeks vs ~5–7 weeks
Point-load resistanceLower vs Higher
Typical use caseCommercial refurb, thin renovation vs new-build residential UFH

Reasons a project ends up at 30mm

  • No UFH in the build — screed is purely a flatness/wearing layer
  • Renovation with almost no finished floor level allowance
  • Bonding directly to a sound, prepared concrete substrate
  • Commercial refurbishment where programme speed is critical
Free quote · No obligation

Get your screed depth confirmed on survey

Send your floor build-up and UFH drawings — we'll confirm the correct depth for your project and quote the pour.

Call now
Same-day reply
Fully insured
5★ reviewed

Choose 30mm when there's no UFH and floor height is tight — it's the fast, thin option over a bonded substrate. Choose 50mm whenever UFH pipework needs proper cover, or where loading and acoustic performance matter more than programme speed. Test it against your UFH design drawing before committing.

— Exeter Liquid Screeders

30mm vs 50mm Screed Depth — questions we get asked

Get your screed depth confirmed on survey

Send your floor build-up and UFH drawings — we'll confirm the correct depth for your project and quote the pour.