Underfloor Heating Screed · Somerset

Underfloor Heating Screed Poured to SR1 in Wells

When Wells self-builders specify UFH, the screed is what makes the system efficient. We pump Cemfloor Therm directly around your pressure-tested pipework for full encapsulation.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Underfloor Heating Screed Poured to SR1 in Wells

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

When Wells self-builders specify UFH, the screed is what makes the system efficient. We pump Cemfloor Therm directly around your pressure-tested pipework for full encapsulation.

For Wells UFH builds the typical sequence is: insulation board down, pipes clipped and pressure-tested, edge insulation in place, then we pump and level in a single visit.

Most of our Wells jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Wells sits Bridgwater (15 mi), and we work the surrounding villages on the same week's diary.

Underfloor Heating Screed in Wells — how it works

For Wells UFH builds the typical sequence is: insulation board down, pipes clipped and pressure-tested, edge insulation in place, then we pump and level in a single visit.

Liquid UFH screed lets you run a thinner build-up than traditional bays — useful when ceiling heights or threshold levels are tight in Wells renovations.

What we plan around in Wells

County

Somerset

District

Somerset

Postcode

BA5

Nearest city

Bridgwater (15 mi)

Nearest motorway

M5 (J22, ~17 mi)

Primary A-road

A39 / A371

Local industries

independent retail, market-town hospitality

Common builds

Georgian townhouses, stone cottages

Where liquid screed earns its keep in Wells

  • Georgian townhouses — a regular brief in Wells
  • Stone cottages — a regular brief in Wells
  • Small new-build estates — a regular brief in Wells
  • High-street shop retrofits — a regular brief in Wells
  • Independent retail — a regular brief in Wells

Wells-area projects

UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton
UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth
Self-build UFH pour near Tiverton
Self-build UFH pour near Tiverton

What to expect on pour day in Wells

  1. 1

    UFH installer fits manifold, pipes and pressure-tests to 6 bar

  2. 2

    We confirm edge insulation, DPM and pipe coverage depth

  3. 3

    Pump and level the screed with pipes still under pressure

  4. 4

    Slow commissioning of the heating — usually after 7 days, ramping per manufacturer spec

  5. 5

    Floor coverings once moisture is signed off and commissioning is complete

Why Wells clients pick us

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Somerset — fresh Wells-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Materials and systems we use in Wells

Cemfloor Therm

Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.

PIR/Phenolic insulation board

70-150mm typical depending on build regs U-value target.

Edge insulation strip

Critical around UFH zones to allow thermal expansion.

Pressure-testing kit

Pipes held at 6 bar through the pour to flag any damage immediately.

What people in Wells usually ask

Can you pour over a heat-pump system in Wells?+

Yes — and we'd argue you should. Heat pumps run at lower flow temperatures than gas, so the screed's thermal conductivity matters more, not less.

When can I switch the underfloor heating on in Wells?+

On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Wells clients to the schedule.

What if a pipe leaks during the pour?+

Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.

Will the screed crack as the UFH heats up?+

Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.

Does liquid UFH screed improve EPC ratings?+

Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.

What depth of screed over UFH pipes do you recommend?+

Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.

Book your Wells pour

Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp