New Build Screeding · Somerset

New Build Screeding Poured to SR1 in Wells

Developers building across Wells need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for New Build Screeding Poured to SR1 in Wells

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Developers building across Wells need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.

Output on a typical Wells plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.

Most of our Wells jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Wells sits Bridgwater (15 mi), and we work the surrounding villages on the same week's diary.

New Build Screeding in Wells — how it works

Output on a typical Wells plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Wells scheme, so plot 1 and plot 40 come out identical.

BA5 access, routes and logistics

County

Somerset

District

Somerset

Postcode

BA5

Nearest city

Bridgwater (15 mi)

Nearest motorway

M5 (J22, ~17 mi)

Primary A-road

A39 / A371

Local industries

independent retail, market-town hospitality

Common builds

Georgian townhouses, stone cottages

What Wells builds usually need

  • Georgian townhouses — a regular brief in Wells
  • Stone cottages — a regular brief in Wells
  • Small new-build estates — a regular brief in Wells
  • High-street shop retrofits — a regular brief in Wells
  • Independent retail — a regular brief in Wells

Wells-area projects

Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton
UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter

Step-by-step for a Wells job

  1. 1

    Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates

  2. 2

    Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot

  3. 3

    Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn

  4. 4

    Protect each plot for 24-48 hours while the crew moves on to the next

  5. 5

    Moisture testing and a written handover record issued per plot

  6. 6

    Snagging and any remedial work coordinated directly with the site manager before final trades move in

Why Wells clients pick us

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Somerset — fresh Wells-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Cemfloor systems for Wells

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

What people in Wells usually ask

Can you scale up if the Wells programme accelerates?+

Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.

How many plots can you screed per day on a Wells development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Do you provide RAMS for a new build site in Wells?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

Do you price the whole Wells site or plot by plot?+

Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Wells site come out to the same depth and finish.

Book your Wells development into the diary

Multi-plot schemes need booking well ahead. Reserve your Wells pour dates now and we'll confirm logistics with your site manager.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp