Garage Floor Screed · Somerset

Garage Floor Screed Poured to SR1 in Wells

Whether you're future-proofing a Wells garage for an EV charger or finishing a workshop floor, liquid screed gives you the flatness and density coatings need to bond.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Garage Floor Screed Poured to SR1 in Wells

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Whether you're future-proofing a Wells garage for an EV charger or finishing a workshop floor, liquid screed gives you the flatness and density coatings need to bond.

For Wells garage conversions becoming habitable rooms, we'll also coordinate UFH and insulation build-up so the finished floor sits at the right level for thresholds.

Most of our Wells jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Wells sits Bridgwater (15 mi), and we work the surrounding villages on the same week's diary.

Garage Floor Screed in Wells — how it works

Liquid screed over a garage slab leaves a surface flat enough for direct application of two-pack epoxy, polyurea or polyaspartic floor coatings — no further levelling compound required.

For Wells garage conversions becoming habitable rooms, we'll also coordinate UFH and insulation build-up so the finished floor sits at the right level for thresholds.

What we plan around in Wells

County

Somerset

District

Somerset

Postcode

BA5

Nearest city

Bridgwater (15 mi)

Nearest motorway

M5 (J22, ~17 mi)

Primary A-road

A39 / A371

Local industries

independent retail, market-town hospitality

Common builds

Georgian townhouses, stone cottages

Where liquid screed earns its keep in Wells

  • Georgian townhouses — a regular brief in Wells
  • Stone cottages — a regular brief in Wells
  • Small new-build estates — a regular brief in Wells
  • High-street shop retrofits — a regular brief in Wells
  • Independent retail — a regular brief in Wells

Recent work near Wells

Garage floor refinished in Torquay
Garage floor refinished in Torquay
Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton
UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton

What to expect on pour day in Wells

  1. 1

    Site visit — assess the existing slab, falls, thresholds

  2. 2

    Prep: clean, prime or lay DPM and insulation

  3. 3

    Pump and level in a single morning

  4. 4

    Cover for 24 hours, walk-on by day 2

  5. 5

    Coatings or floor finishes once dry — typically 7-14 days

Trust points for a Wells brief

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Somerset — fresh Wells-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Materials and systems we use in Wells

Cemfloor CT-C30-F6

Cement-based screed — robust, coating-ready surface.

Bonding primer

For bonded pours over existing slabs.

DPM and slip membrane

For unbonded over insulation or older slabs.

Shot-blasting / grinding prep

Where the existing slab needs surface profile.

FAQs from Wells clients

Will it slope to a drain?+

Liquid screed self-levels — it won't form a fall. If you need a drain fall in your Wells garage, we form it in the substrate first, then screed at constant thickness.

What about cold garages — will it cure?+

We won't pour below 5°C. For winter jobs we'll either heat the space or schedule for a mild day in your Wells diary.

Do you tidy up afterwards?+

Wash-out is bagged and removed. We leave the Wells site clean and the floor protected with sheeting.

Can I finish the floor with epoxy?+

Absolutely — liquid screed gives you a flat, dense base that resin coatings bond to well once the screed is dry and the surface laitance is sanded off.

Can liquid screed take an EV charger and a car's weight in Wells?+

Yes — a properly specified 40-50mm liquid screed easily handles domestic vehicle loads. We'll size the build-up to your Wells garage usage.

Can you do garage conversions as well?+

Yes — full conversion floors with insulation, UFH and screed in one coordinated package across Wells and the surrounding area.

Book your Wells pour

Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp